Mukarba Chowk Panipat NH-44 Toll Road
One of 10,000+ projects Taiyo tracks in India.
Source: World Bank Group
The project entails the widening of the existing four - lane road into eight of a section of NH-1 from Mukarba Chowk at 15.5 km in New Delhi to Panipat at 86 km in Haryana (total length 71.4 km), by Mukarba Chowk-Panipat Toll Roads ("Project Company").
Sponsors are Essel Infraprojects and Essel Highways from Essel Group.
The concession was awarded by National Highways Authority of India (NHA
- Status
- Prospective
- Sector
- Road, Government, Commercial
- Location
- India
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Mukarba Chowk Panipat NH-44 Toll Road
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project entails the widening of the existing four - lane road into eight of a section of NH-1 from Mukarba Chowk at 15.5 km in New Delhi to Panipat at 86 km in Haryana (total length 71.4 km), by Mukarba Chowk-Panipat Toll Roads ("Project Company"). Sponsors are Essel Infraprojects and Essel Highways from Essel Group. The concession was awarded by National Highways Authority of India (NHAI) for a period of 17 years including a construction period of 2.5 years on a DBFOT basis. Essel Group won the bid by quoting the lowest VGF at $28 million (INR 189 Crore). Cost of pre-construction activities to be financed by NHAI is $11 million (INR 75.79 crore) and this amount has been considered in the computation of value of direct government support. The total project cost is $347.6 million (INR 2128.72 crore). Financing comprises a$233.6 million term loan and a $113.9 million equity contribution (inclusive of the VGF of $28 million). Lenders are India Infrastructure Finance, IDFC and Biggs Trading. Financial close occurred on 28 April 2016. CareRating Rationale from Factiva http://www.pppinindia.com/pppac/70_pppacMinutes20150218.PDF http://in.reuters.com/article/care-ratings-idINL3N17I2AY http://nhai.org.in/spw/ProjectDetailsmcpa.aspx http://www.esselinfraprojects.com/admin/mediaDownloads/Essel%20Infraprojects%20bags%20Two%20Road%20Projects%20from%20NHAI.pdf https://ijglobal.com/data/transaction/31172/mukarba-chowk-panipat-section-nh-1-ppp-714km |
Original sector | Transport |
Procurement method | |
Budget |
Location
Country | India |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Road, Government, Commercial |
Article published date | 2024-10-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in India
- Dholera Solar Park Gujarat
- Sugen 1100MW CCGT Akhakhol Gujarat
- ONGC Tripura Power Plant
- Cable-stayed bridge project in the Chambal River
- Mumbra Bypass Project
- Essel Gwalior Shivpuri Toll Roads Private Limited
- RattanIndia Power Limited (Amravati Thermal Power Project)
- GVRMP Belgaum Khanapur Tollway Private Limited
