Mukilteo Central Waterfront Park
Sector: Car parking • Location: Mukilteo, Washington, United States of America
Source: Dodge USA
The City of Mukilteo is proposing to redevelop the subject property so it can be used as a public open space. Work includes filling utility vaults with CDF and grading the site level. The existing site is a mix of asphalt and gravel. The City will spread 300 cubic yards of 3/4 crushed rock to level the site. No material will be removed from the site and no additional impervious surface area will b
- Status
- Closed
- Sector
- Car parking, Power Transmission, Road, Government, Automotive, Commercial, Power Generation (CCGT), Manufacturing (Industrial), Waste Processing and Treatment, Water Supply and Storage
- Location
- Mukilteo, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Mukilteo Central Waterfront Park
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The City of Mukilteo is proposing to redevelop the subject property so it can be used as a public open space. Work includes filling utility vaults with CDF and grading the site level. The existing site is a mix of asphalt and gravel. The City will spread 300 cubic yards of 3/4 crushed rock to level the site. No material will be removed from the site and no additional impervious surface area will be added. Following grading, the City will install minor park improvements such as picnic tables a... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Mukilteo |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Car parking, Power Transmission, Road, Government, Automotive, Commercial, Power Generation (CCGT), Manufacturing (Industrial), Waste Processing and Treatment, Water Supply and Storage |
Article published date | 2023-05-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- MIDTOWN CONNECTOR IMPROVEMENTS
- P'TREE IND BLVD PEDESTRIAN CORRIDOR IN CHAMBLEE-LCI PROJECT
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
