Mulilo De Aar 1 Wind Farm

Sector: Biomass • Location: South Africa

Source: World Bank Group

Project
Active

The 96.48MW Mulilo De Aar 1 Wind Farm project reached financial closure in July 2015. This greenfield BOO project worth of ZAR2 billion (US$180 million) would entail the development of a wind farm with total capacity of 96.48MW in De Aar region of the Northern Cape Province in South Africa. It was a part of Window 3 of the Renewable Energy Independent Power Producer Procurement Programme (REIPPPP)

Project Information FAQ

Project Information

5 Q
The project “Mulilo De Aar 1 Wind Farm” is an infrastructure initiative in the Biomass sector, located in South Africa. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The 96.48MW Mulilo De Aar 1 Wind Farm project reached financial closure in July 2015. This greenfield BOO project worth of ZAR2 billion (US$180 million) would entail the development of a wind farm with total capacity of 96.48MW in De Aar region of the Northern Cape Province in South Africa. It was a part of Window 3 of the Renewable Energy Independent Power Producer Procurement Programme (REIPPPP) by Department of Energy (DoE). The DoE selected six solar photovoltaic, seven wind, two concentrated solar power, one landfill gas and one biomass project as preferred bidders in October 2013 for the third round of its REIPPP and the sponsors for each project were scheduled to simultaneously sign power purchase agreements with state utility Eskom and reach financial close on 30 July. The financial closure was delayed mainly due to the insufficient transmission infrastructure for the generation facilities. On July 22, DoE confirmed that the 17 projects involved in the third round of REIPPP would not reach financial close on 30 July 2014, as planned. Unlike in previous rounds of the REIPPP, where the signing of project documents and financial close happened simultaneously, none of the Window 3 deals was expected to close before January 2015 at the earliest, according to sources working on the transactions. The Construction of the project was scheduled to start in October 2015, and the wind farm was expected to start operation on 31 October 2015. China Longyuan Power Group was selected as EPC contractor and the project company was Longyuan Mulilo De Aar Wind Power (RF) Pty Ltd, composed of Mulilo Wind Enterprises (20%), Longyuan South Africa Renewables (60%), Mulilo De Aar Wind Community (RF) (12.5%) and ETU Energy Resources (RF) (7.5%). Financing comprised US$135 million (ZAR1.5 billion) term loan and US$45 million(ZAR509 million) equity. Nedbank and Industrial Development Corporation of South Africa are MLAs. Financial close occurred on 6 February 2015.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data