Mulilo De Aar 2 Wind Farm
Sector: Biomass • Location: Northern Cape, South Africa
Source: World Bank Group
The 138.9MW Mulilo De Aar 2 Wind Farm Wind Farm project reached financial closure in July 2015. This greenfield BOO project worth of US$252.5 million (ZAR2.8 billion) would entail the development of a wind farm with total capacity of 138.9MW in De Aar region of the Northern Cape Province in South Africa. It was a part of Window 3 of the Renewable Energy Independent Power Producer Procurement Progr
- Status
- Prospective
- Sector
- Biomass, Wind, Manufacturing (Industrial), Power Generation (CCGT), Raw Materials, Solar, Power Transmission, Commercial, Government
- Location
- Northern Cape, South Africa
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Mulilo De Aar 2 Wind Farm
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The 138.9MW Mulilo De Aar 2 Wind Farm Wind Farm project reached financial closure in July 2015. This greenfield BOO project worth of US$252.5 million (ZAR2.8 billion) would entail the development of a wind farm with total capacity of 138.9MW in De Aar region of the Northern Cape Province in South Africa. It was a part of Window 3 of the Renewable Energy Independent Power Producer Procurement Programme (REIPPPP) by Department of Energy (DoE). The DoE selected six solar photovoltaic, seven wind, two concentrated solar power, one landfill gas and one biomass project as preferred bidders in October 2013 for the third round of its REIPPP and the sponsors for each project were scheduled to simultaneously sign power purchase agreements with state utility Eskom and reach financial close on 30 July. The financial closure was delayed mainly due to the insufficient transmission infrastructure for the generation facilities. On July 22, DoE confirmed that the 17 projects involved in the third round of REIPPP would not reach financial close on 30 July 2014, as planned. Unlike in previous rounds of the REIPPP, where the signing of project documents and financial close happened simultaneously, none of the Window 3 deals was expected to close before January 2015 at the earliest, according to sources working on the transactions. The Construction of the project was scheduled to start in August 2015, and the wind farm was expected to start operation on 31 October 2017. China Longyuan Power Group was selected as EPC contractor and the project company was Longyuan Mulilo De Aar 2 Wind Power (RF) Pty Ltd, composed of Mulilo Wind Enterprises (20%), Longyuan South Africa Renewables (60%), Mulilo De Aar 2 Wind Community (RF) (12.5%) and ETU Energy Resources (RF) (7.5%). Financing comprised US$189.4 million (ZAR2.1 billion) term loan and US$63 million(ZAR720 million) equity. Nedbank and Industrial Development Corporation of South Africa are MLAs. Financial close occurred on 6 February 2015. |
Original sector | Energy |
Budget |
Location
Country | South Africa |
State | Northern Cape |
Source
Source reliability | High |
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Biomass, Wind, Manufacturing (Industrial), Power Generation (CCGT), Raw Materials, Solar, Power Transmission, Commercial, Government |
Article published date | 2023-02-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project