Mulilo Prieska Copperton Solar Plant

Sector: Solar • Location: South Africa

Source: World Bank Group

Project
Active

Mulilo Renewable Energy Solar PV Prieska (PTY) LTD was created to build, own and operate a 20 MW solar PV facility to be located in Prieska, South Africa. The SPV was majority owned (60%)by Gestamp Asetym Solar SL, subsidiary of Gestamp Solar, of Gestamp Group. Mulilo Renewable Energy (subsidiary of Mulilo Energy Group, of which CSV Construction was a major shareholder) owned 20%. The remaining 2

Project Information FAQ

Project Information

4 Q
The project “Mulilo Prieska Copperton Solar Plant” is an infrastructure initiative in the Solar sector, located in South Africa. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Mulilo Renewable Energy Solar PV Prieska (PTY) LTD was created to build, own and operate a 20 MW solar PV facility to be located in Prieska, South Africa. The SPV was majority owned (60%)by Gestamp Asetym Solar SL, subsidiary of Gestamp Solar, of Gestamp Group. Mulilo Renewable Energy (subsidiary of Mulilo Energy Group, of which CSV Construction was a major shareholder) owned 20%. The remaining 20% was owned by Mulilo Prieska Solar Community, 100% owned by Mulilo Prieska Solar Community Trust - with support of the Industrial Development Corporation (IDC). The project was to consist of 89,760 panels of 230W, and 40 inverters of 500kW. The project was awarded in a tender administered by the Department of Energy where a critical factor in the decision was the projected price of power. Contractual negotiations on the PPA and financing were to be completed by June 2012, but it was predicted that there would be a 20 year PPA with the state owned utility, Eskom. Equipment was to be supplied by Trina PV (China), through a contract with Gestamp Solar. The inverters were to be supplied by GP Tech. The project was to be connected to Cuprum substation 11kV. The EPC & O&M contractor was to be Gestamp Solar Contracting (90% owned by Gestamp Asetym Solar SL, 10% owned by Rigamani Construction PTY LTD). The EIA was completed in April 2011. Estimated project cost was ZAR 554.4 million ($70 million), with commissioning expected in 2013. The project applied for UNFCCC CDM financing, through Blueworldcarbon (BWC). Funding was expected to be provided by NedBank Capital (50%) and the Industrial Development Corporation (50%), the debt/equity ratio was expected to be 70/30. The coordinates were: Geographical latitude: 29°58' S. Geographical longitude: 22°19' E. http://cdm.unfccc.int/filestorage/X/D/U/XDUGZ71RAI6ECNV3HQ9OW84TYP2FBS/Untitled%20%28uploaded%2010%20Aug%2011%2009%3A15%3A48%29.pdf?t=SWd8bTNpN3h0fDBakBFgjcpcKvtTnQRGhcjs http://www.nersa.org.za/Admin/Document/Editor/file/Consultations/Electricity/Presentations/Mulilo%20Renewable%20Energy%20Solar%20PV%20Prieska.pdf http://www.bdexcel.com/company-prieska-investment-company.html http://www.energy.gov.za/files/esources/kyoto/2012/PDD_Prieska_Version20_09-12-2011.pdf

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data