Mullewa Water Main Project
Sector: Water Supply and Storage • Location: Western Australia, Australia
Source: Trenchless Australasia
Rob Carr delivered the Mullewa water main project, which included 7.2km of DN300 PVC pipe via open cut and a DN700 reinforced concrete rail crossing.
- Status
- Closed
- Sector
- Water Supply and Storage, Cement, Rail
- Location
- Western Australia, Australia
- Updated
- 22 Jul 2026
- Source
- Trenchless Australasia
ConstructChat
Ask ConstructChat about Mullewa Water Main Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Rob Carr delivered the Mullewa water main project, which included 7.2km of DN300 PVC pipe via open cut and a DN700 reinforced concrete rail crossing. |
Original sector | Water |
Location
Country | Australia |
State | Western Australia |
Source
Source | Trenchless Australasia |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Rail |
Article published date | 2025-01-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in Australia
- Kidston Pumped Storage Hydro Project Queensland Australia
- Cullerin Range Wind Farm
- Callide CoalFired Power Stations Queensland
- Millmerran CoalFired Power Station Australia
- Barker Inlet Power Station Adelaide
- Shoalhaven Starches Ethanol Plant Expansion New South Wales Australia
- Wyaralong Dam Project
- Gold Coast Desalination Plant, Queensland
