Mullikulam Wind Power Transmission Project (MWPTP)
Sector: Wind • Location: Mannar, Sri Lanka
Source: Scanx
Construction of a 28km long, 220kV double circuit transmission line from Mannar GS to Mullikulam Collector Grid Substation in Sri Lanka to evacuate power generated by the Mullikulam Wind Power Projects to the national grid.
- Status
- Closed
- Sector
- Wind, Power Generation (CCGT), Power Transmission
- Location
- Mannar, Sri Lanka
- Updated
- 22 Jul 2026
- Source
- Scanx
ConstructChat
Ask ConstructChat about Mullikulam Wind Power Transmission Project (MWPTP)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | awarded |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Construction of a 28km long, 220kV double circuit transmission line from Mannar GS to Mullikulam Collector Grid Substation in Sri Lanka to evacuate power generated by the Mullikulam Wind Power Projects to the national grid. |
Original sector | Energy |
Budget |
Location
Country | Sri Lanka |
City | Mannar |
Source
Source | Scanx |
URL |
More Details
Record type | Project |
Sector | Wind, Power Generation (CCGT), Power Transmission |
Article published date | 2026-05-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
