logo
ProjectArchived

Multi-Algorithm Reservoir Sedimentation Estimation

Archived · United States of America

Source: Grants.gov

Water resource management in the western U.S. is reliant upon aging reservoirs for critical storage and flood mitigation. One impending concern is the sediment design life of these reservoirs, which remains largely uncertain due to both practical and logistical challenges in sediment monitoring. This work aims to comprehensively estimate historical, current, and projected future sediment loading a

Status
Closed
Sector
Advanced Electronics, Warehouse, Water Supply and Storage, Government, Commercial, Education, Manufacturing (Industrial)
Location
United States of America
Updated
22 Jul 2026
Source
Grants.gov

ConstructChat

Ask ConstructChat about Multi-Algorithm Reservoir Sedimentation Estimation

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Multi-Algorithm Reservoir Sedimentation Estimation” is an infrastructure initiative in the Advanced Electronics sector, located in United States of America. Taiyo aggregates data on it from Grants.gov.

Participants

Sponsoring Agency

Status

Original status

archived

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Water resource management in the western U.S. is reliant upon aging reservoirs for critical storage and flood mitigation. One impending concern is the sediment design life of these reservoirs, which remains largely uncertain due to both practical and logistical challenges in sediment monitoring. This work aims to comprehensively estimate historical, current, and projected future sediment loading along with attendant uncertainties through the coordinated application of multiple sediment modeling approaches over the western U.S. This framework will integrate empirical, conceptual, and process‐based models (5 models in total) across key reservoirs using the overarching 1/16° Variable Infiltration Capacity model structure developed for USBR by Livneh et al. (2015). Focus will be given to model uniqueness so as to incorporate and test truly independent sediment model physics. In addition, the importance of model scale will be investigated. Rigorous evaluation of this modeling framework will include calibration and validation of simulated sediment loading and discharge. This framework will be applied to un‐surveyed or not recently surveyed reservoirs and will enable estimates of projected sediment and hence provide a probabilistic estimate of reservoir design life. Major outcomes will be an improved understanding of sedimentation processes and an estimate of uncertainty. Overall, this effort can be used to identify areas of greatest risk for sedimentation and inform mitigation strategies.

Budget

Location

Country

United States of America (USA)

Source

Source reliability

High

Source

Grants.gov

URL

More Details

Record type

Project

Sector

Advanced Electronics, Warehouse, Water Supply and Storage, Government, Commercial, Education, Manufacturing (Industrial)

Article published date

2023-06-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project