Multi-Client 3D Streamer Acquisition and Processing Project in Åsta Graben
The owner, status and timeline of this project. A free account opens every field.
Source: Offshore Engineer Magazine
TGS has secured a new multi-client 3D streamer acquisition and processing project in the Åsta Graben area of the Norwegian North Sea. The GeoStreamer survey will expand existing data coverage and provide dual azimuth coverage over prospective areas to generate GeoStreamer X data. The project is supported by industry funding and is scheduled to start imminently with a duration of approximately 75 d
- Status
- Prospective
- Sector
- Energy
- Location
- Norway
- Updated
- 19 Nov 2026
- Source
- Offshore Engineer Magazine
ConstructChat
Ask ConstructChat about Multi-Client 3D Streamer Acquisition and Processing Project in Åsta Graben
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | TGS has secured a new multi-client 3D streamer acquisition and processing project in the Åsta Graben area of the Norwegian North Sea. The GeoStreamer survey will expand existing data coverage and provide dual azimuth coverage over prospective areas to generate GeoStreamer X data. The project is supported by industry funding and is scheduled to start imminently with a duration of approximately 75 days. |
Original sector | Energy |
Location
Country | Norway |
Source
Source | Offshore Engineer Magazine |
URL |
More Details
Record type | Project |
Article published date | 2026-05-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
