logo
ProjectClosed

Multi-sector Infrastructure Rehabilitation Project

The status, timeline and source of this project. A free account opens every field.

Source: World Bank

The Multi-Sector Infrastructure Rehabilitation Project for Guinea-Bissau aims to increase the availability of urban power, water and roads infrastructure services. The project has the following components: Component 1: will finance technical assistance, local and international consultants, specialized financial and accounting software for the utility, and institutional development and strengthenin

Status
Closed
Sector
Road, Solar, Water Supply and Storage, Power Transmission, Waste Processing and Treatment, Wind, Geothermal, Residential, Hydro, Power Generation (CCGT), Government, Commercial
Location
Guinea-Bissau
Updated
22 Jul 2026
Source
World Bank

ConstructChat

Ask ConstructChat about Multi-sector Infrastructure Rehabilitation Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Multi-sector Infrastructure Rehabilitation Project” is an infrastructure initiative in the Road sector, located in Guinea-Bissau. Taiyo aggregates data on it from World Bank.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Multi-Sector Infrastructure Rehabilitation Project for Guinea-Bissau aims to increase the availability of urban power, water and roads infrastructure services. The project has the following components: Component 1: will finance technical assistance, local and international consultants, specialized financial and accounting software for the utility, and institutional development and strengthening support for the Ministry of Economy and, when it is established, for the Multi-Sector Regulatory Agency. Component 2: will essentially support a fast-tracked restoration and rehabilitation of power generation and distribution, and commercial operations in Bissau. Component 3: will finance the rehabilitation and reinforcement of water production systems in the city of Bissau, for the purpose of restoring a 24 hour a day water service to the entire population of Bissau. Component 4: will essentially include a limited rehabilitation of pot holes along a set of roads of 20-30 kilometers in the City of Bissau. Component 5: will finance the operational costs of the Project Coordination Unit (PCU), including: (a) staff (consultants); (b) technical assistance and auditing costs; (c) office equipment and supplies; (d) office rental, utilities and related expenses; (e) accounting and office software; (f) vehicle maintenance costs, fuel and spare parts; (g) training; and, (h) coordination and study travel costs.

Original sector

FY17 - Energy and Extractives,FY17 - Public Administration,FY17 - Transportation,FY17 - Water, Sanitation and Waste Management

Budget

Location

Country

Guinea-Bissau

Source

Source

World Bank

URL

More Details

Record type

Project

Sector

Road, Solar, Water Supply and Storage, Power Transmission, Waste Processing and Treatment, Wind, Geothermal, Residential, Hydro, Power Generation (CCGT), Government, Commercial

Article published date

2025-12-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project