Multi-sector Infrastructure Rehabilitation Project
Sector: Road • Location: Guinea-Bissau
Source: World Bank Group
The Multi-Sector Infrastructure Rehabilitation Project for Guinea-Bissau aims to increase the availability of urban power, water and roads infrastructure services. The project has the following components: Component 1: will finance technical assistance, local and international consultants, specialized financial and accounting software for the utility, and institutional development and strengthenin
- Status
- Closed
- Sector
- Road, Solar, Water Supply and Storage, Power Transmission, Waste Processing and Treatment, Wind, Geothermal, Residential, Hydro, Power Generation (CCGT), Government, Commercial
- Location
- Guinea-Bissau
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Multi-sector Infrastructure Rehabilitation Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Multi-Sector Infrastructure Rehabilitation Project for Guinea-Bissau aims to increase the availability of urban power, water and roads infrastructure services. The project has the following components: Component 1: will finance technical assistance, local and international consultants, specialized financial and accounting software for the utility, and institutional development and strengthening support for the Ministry of Economy and, when it is established, for the Multi-Sector Regulatory Agency. Component 2: will essentially support a fast-tracked restoration and rehabilitation of power generation and distribution, and commercial operations in Bissau. Component 3: will finance the rehabilitation and reinforcement of water production systems in the city of Bissau, for the purpose of restoring a 24 hour a day water service to the entire population of Bissau. Component 4: will essentially include a limited rehabilitation of pot holes along a set of roads of 20-30 kilometers in the City of Bissau. Component 5: will finance the operational costs of the Project Coordination Unit (PCU), including: (a) staff (consultants); (b) technical assistance and auditing costs; (c) office equipment and supplies; (d) office rental, utilities and related expenses; (e) accounting and office software; (f) vehicle maintenance costs, fuel and spare parts; (g) training; and, (h) coordination and study travel costs. |
Original sector | FY17 - Energy and Extractives,FY17 - Public Administration,FY17 - Transportation,FY17 - Water, Sanitation and Waste Management |
Budget |
Location
Country | Guinea-Bissau |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Road, Solar, Water Supply and Storage, Power Transmission, Waste Processing and Treatment, Wind, Geothermal, Residential, Hydro, Power Generation (CCGT), Government, Commercial |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in Guinea-Bissau
- Guinea-Bissau - Post-Conflict Rehabilitation Project
- CONSTRUCTION DE ROUTE JUDUGUL-BANBADINCA
- Guinea Bissau - Rice Value Chain Development Project in the Bafata and Oio Regions
- GUINEA BISSAU - Value Chains, Agricultural and Rural Entrepreneurship Support Project (PACVEAR-GAFSP) - Additional Financing
- ROUTE BAMBADINCA-XITOLE-QUEBO-BUBA
- PORT BISSAU
- Second Add. Fin. to Rural Community-Driven Development Project
- Enhancing Connectivity in Northern Guinea-Bissau Project
