Multi-Service Center Energy Efficiency Upgrade
One of 10,000+ projects Taiyo tracks in California.
Source: Dodge USA
The work for Multi-Service Center consists of removing existing rooftop mechanical equipment, replacing it with new equipment, remove and replace existing building roofing system with new system, infill skylights as required, remove all existing equipment screen walls and replace with new screen walls
- Status
- Closed
- Sector
- Residential, Commercial, Government
- Location
- Long Beach, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Multi-Service Center Energy Efficiency Upgrade
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work for Multi-Service Center consists of removing existing rooftop mechanical equipment, replacing it with new equipment, remove and replace existing building roofing system with new system, infill skylights as required, remove all existing equipment screen walls and replace with new screen walls |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Long Beach |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Residential, Commercial, Government |
Article published date | 2024-07-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Residential projects in United States of America
- I-20 FROM CARROLL COUNTY LINE TO 0.15 MI E OF SR 5
- SR 22 SPUR FROM 0.23 MI W OF CR 2111/REESE ROAD TO SR 22
- RELOC & STORE 121 BRIDGE BEAMS/529 R-E PANELS/PRES.PKWY
- CR 347/ DAVID'S HOME CHURCH RD @ SCULL SHOAL CREEK
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
