Multi-Tile SoC Physical Design Project
The status, timeline and source of this project. A free account opens every field.
Source: Oneindia
Srikanth Aitha led a highly complex multi-tile SoC physical design project involving multiple design sites and teams. The project was completed under aggressive scheduling constraints with zero tolerance for delivery delays, achieving outstanding operational success and establishing new benchmarks for SoC physical design execution from initial planning through final GDS deliverables. The project i
- Status
- Closed
- Sector
- Advanced Electronics, Power Generation (CCGT)
- Updated
- 22 Jul 2026
- Source
- Oneindia
ConstructChat
Ask ConstructChat about Multi-Tile SoC Physical Design Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Srikanth Aitha led a highly complex multi-tile SoC physical design project involving multiple design sites and teams. The project was completed under aggressive scheduling constraints with zero tolerance for delivery delays, achieving outstanding operational success and establishing new benchmarks for SoC physical design execution from initial planning through final GDS deliverables. The project involved seamless coordination, performance, power, and area optimization, and innovative strategies for managing design constraints and ECO implementations. |
Original sector | Semiconductor |
Location
| Not available for this record. |
Source
Source | Oneindia |
URL |
More Details
Record type | Project |
Sector | Advanced Electronics, Power Generation (CCGT) |
Article published date | 2025-12-12 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Advanced Electronics projects
- KRASNODAR STADIUM
- Kinnear Centre for Creativity and Innovation
- Centre for the Commercialization of Biomedical Technology
- I-90 eastgate to sr 900
- 108th avenue ne complete street
- Pump Stations Improvement: Niskey Lake 1 & 2, Rivermeade, and Highlands
- Ned Kahn Public Art Projects
- Tefft Street at Highway 101 Interchange
