Multi-Use Path Construction
Sector: Road • Location: Hattiesburg, Mississippi, United States of America
Source: Dodge USA
The work shall consist essentially of the following items: The construction of approximately 4,742 linear feet of 10 foot wide, 4-inch thick, concrete multi-use path along the north side of Classic Drive from Pine Tree Drive to Beverly Hills Road, and along the south side of Classic Drive from Beverly Hills Road to the East side of Golf Course Road. bids for the construction of a multi-use path al
- Status
- Closed
- Sector
- Road, Cement, Government, Commercial, Manufacturing (Industrial)
- Location
- Hattiesburg, Mississippi, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Multi-Use Path Construction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work shall consist essentially of the following items: The construction of approximately 4,742 linear feet of 10 foot wide, 4-inch thick, concrete multi-use path along the north side of Classic Drive from Pine Tree Drive to Beverly Hills Road, and along the south side of Classic Drive from Beverly Hills Road to the East side of Golf Course Road. bids for the construction of a multi-use path along Classic Drive for a total project length of 0.898 miles |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Mississippi |
City | Hattiesburg |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Road, Cement, Government, Commercial, Manufacturing (Industrial) |
Article published date | 2024-08-19 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in United States of America
- KING STREET IN COHUTTA
- SR 120/ROSWELL RD@CR 4662/EAST COBB DR EXT LT TURN LANE
- DISTRICTWIDE PAVEMENT MARKING DIST 7
- EPHESUS CHURCH ROAD BR.& APPR.@ DOG RIVR(097-02278-00105E)
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 109 FROM ALABAMA STATE LINE TO SR 14/US 29
- JASPER-DAHLONEGA ROAD
- MOULTRIE - SYLVESTER ROAD
