logo

Multi Use Path Construction

Sector: Water Supply and Storage • Location: Salmon Arm, British Columbia, Canada

Source: Dodge USA

Project
Closed

Construction of a new 3.0m wide, 132m long paved multi-use pathway and 131m of curb and gutter with letdowns. Works include, but are not limited to, boulevard landscaping, lighting, new catch basin installation, sign construction, and irrigation.

Project Information FAQ

Project Information

4 Q
The project “Multi Use Path Construction” is an infrastructure initiative in the Water Supply and Storage sector, located in Salmon Arm, British Columbia, Canada. Taiyo aggregates data on it from Dodge USA.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Construction of a new 3.0m wide, 132m long paved multi-use pathway and 131m of curb and gutter with letdowns. Works include, but are not limited to, boulevard landscaping, lighting, new catch basin installation, sign construction, and irrigation.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data