Multi-Use Path Maintenance Enhancement
Sector: Car parking • Location: Santa Rsa Bch, Florida, United States of America
Source: Dodge USA
All RIGHT OF WAY shown on the attached maps for CR 30A, SCENIC GULF DRIVE, and the FEEDER ROADS listed below must be maintained as described above in Section 3.1. Allen Loop Thompson Road Oyster Lake Causeway CR395 CR83 CR283 CR393, which shall also include the portion of CR393 between U.S. Hwy 98 and Ridge Road and Lakewood Drive between the intersection of 30A and Beachfront Trail. All Right of
- Status
- Closed
- Sector
- Car parking, Road, Bridge, Automotive, Government, Commercial
- Location
- Santa Rsa Bch, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Multi-Use Path Maintenance Enhancement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | All RIGHT OF WAY shown on the attached maps for CR 30A, SCENIC GULF DRIVE, and the FEEDER ROADS listed below must be maintained as described above in Section 3.1. Allen Loop Thompson Road Oyster Lake Causeway CR395 CR83 CR283 CR393, which shall also include the portion of CR393 between U.S. Hwy 98 and Ridge Road and Lakewood Drive between the intersection of 30A and Beachfront Trail. All Right of Way maintained / paid for, by the county. These areas are on the opposite side of the road from t... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Santa Rsa Bch |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Car parking, Road, Bridge, Automotive, Government, Commercial |
Article published date | 2024-09-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- MIDTOWN CONNECTOR IMPROVEMENTS
- P'TREE IND BLVD PEDESTRIAN CORRIDOR IN CHAMBLEE-LCI PROJECT
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
