logo
ProjectClosed

Multi-Use Pathway Construction

One of 10,000+ projects Taiyo tracks in Alberta.

Source: Dodge

Construction of a paved multi-use pathway connecting to and within the Hamlet of Lake Newell Resort. Project scope includes but is not limited to: survey, utility coordination, earthworks, culverts, paving, signage, and hydroseeding. Relocation of an existing water line air valve is required to complete the works. The project provides approximately 4.3km of expansion to the existing pathway networ

Status
Closed
Sector
Mass Transit, Hotel, Rail, Government, Road, Waste Processing and Treatment, Power Transmission, Commercial, Water Supply and Storage, Car parking, Automotive, Power Generation (CCGT)
Location
Brooks, Alberta, Canada
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Multi-Use Pathway Construction

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Multi-Use Pathway Construction” is an infrastructure initiative in the Mass Transit sector, located in Brooks, Alberta, Canada. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Construction of a paved multi-use pathway connecting to and within the Hamlet of Lake Newell Resort. Project scope includes but is not limited to: survey, utility coordination, earthworks, culverts, paving, signage, and hydroseeding. Relocation of an existing water line air valve is required to complete the works. The project provides approximately 4.3km of expansion to the existing pathway network in the County of Newell.

Procurement method

Budget

Location

Country

Canada

State

Alberta

City

Brooks

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Mass Transit, Hotel, Rail, Government, Road, Waste Processing and Treatment, Power Transmission, Commercial, Water Supply and Storage, Car parking, Automotive, Power Generation (CCGT)

Article published date

2025-03-21

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project