Multi-Use Pathway Repairs
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
Contractor shall remove and mill out all damaged areas (of varying widths) from the existing mixed-use asphalt pathways (as marked in Attachment #4) down to the existing grade. All tree roots and vegetative matter must be removed from these areas as part of the process. Allroots shall be cut back at least six (6) inches from the edges of the new asphalt. b. Contractor shall prepare all exposed sur
- Status
- Closed
- Sector
- Manufacturing (Industrial), Commercial, Road, Government, Consumer Products
- Location
- Seabrook Island, South Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Multi-Use Pathway Repairs
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Contractor shall remove and mill out all damaged areas (of varying widths) from the existing mixed-use asphalt pathways (as marked in Attachment #4) down to the existing grade. All tree roots and vegetative matter must be removed from these areas as part of the process. Allroots shall be cut back at least six (6) inches from the edges of the new asphalt. b. Contractor shall prepare all exposed surfaces prior to repaving by grading and compacting loose base materials. Where applicable, creatio... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | South Carolina |
City | Seabrook Island |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Commercial, Road, Government, Consumer Products |
Article published date | 2024-10-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- SR 75 FROM SR 2 TO NORTH CAROLINA STATE LINE
- SR 20 FM PRESTON HILLS/LAUREL DR TO CR 715/REYNOLDS RD
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 10 FROM CR 107/NORTH LEG DRIVE TO CR 2485/HALE STREET
- CS 493/INDUSTRIAL BLVD FROM SR 19 TO SR 31 - TIA
- SR 19;SR 23; SR 26 & SR 204 @ 9 LOCS - BRIDGE PRESERVATION
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- West lake sammamish parkway phase 2
