Multimodal Intelligent Traffic Signal Systems Engineering
Sector: Automotive • Location: Washington, United States of America (USA)
Source: Federal Highway Administration (FHWA)
This project aims to conduct the foundational analysis and design necessary to prepare for the development and field testing/demonstration of multimodal intelligent traffic signal systems (MMITSS), which is defined as a comprehensive traffic signal system taking advantage of the connected vehicle environment for multiple transportation modes, including general passenger vehicles, transit, emergenc
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | completed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | This project aims to conduct the foundational analysis and design necessary to prepare for the development and field testing/demonstration of multimodal intelligent traffic signal systems (MMITSS), which is defined as a comprehensive traffic signal system taking advantage of the connected vehicle environment for multiple transportation modes, including general passenger vehicles, transit, emergency vehicles, freight vehicles, and pedestrians. The MMITSS incorporates, at a minimum, the following arterial traffic signal applications identified by the dynamic mobility application (DMA) program of the U.S. Department of Transportation: intelligent traffic signal system, transit signal priority, mobile accessible pedestrian signal system, emergency vehicle preemption, and freight signal priority. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Automotive projects in United States of America (USA)
- US 77 Victoria
- FM 1960 Access Management Study from East Gatewick to BF 1960A
- FM 1179 (E Villa Maria Road and Briarcrest Drive) Raised Medians
- Texas Electric Vehicle Infrastructure Plan
- SH 249 Harris County - BW 8 to I-45 North
- FM 2818 (Harvey Mitchell Parkway) widening
- US 82 (West of Clarksville), US 82 (East of Clarksville) and US 82 Clarksville Loop Projects
- US 59 - El Campo
