Multinational - 330 KV Ghana – Burkina – Mali Interconnection Project Study
The status, timeline and source of this project. A free account opens every field.
Source: African Development Bank (AfDB)
This intervention concerns the 330 KV Ghana – Burkina – Mali Interconnection Project Study. The project comprises a double circuit high voltage transmission line from Bolgatanga (Ghana) to Sikasso (Mali) through Bobo Dioulasso (Burkina). It shall facilitate power exchanges between Ghana, Burkina and Mali and among other countries of the ECOWAS region and reinforce the stability and reliability of
- Sector
- Power Transmission, Power Generation (CCGT), Road, Government
- Location
- World
- Updated
- 22 Jul 2026
- Source
- African Development Bank (AfDB)
ConstructChat
Ask ConstructChat about Multinational - 330 KV Ghana – Burkina – Mali Interconnection Project Study
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This intervention concerns the 330 KV Ghana – Burkina – Mali Interconnection Project Study. The project comprises a double circuit high voltage transmission line from Bolgatanga (Ghana) to Sikasso (Mali) through Bobo Dioulasso (Burkina). It shall facilitate power exchanges between Ghana, Burkina and Mali and among other countries of the ECOWAS region and reinforce the stability and reliability of the WAPP interconnected system. The 330 kV WAPP Ghana – Burkina – Mali Interconnection Project shall reinforce the energy supply capacities of Mali (EDM-SA) and Burkina Faso (SONABEL) through the diversification of their mode of electricity provision. It shall also increase reliability for power supply to Ouagadougou given that it shall represent an alternate path for importations from Cote d’Ivoire as well as Ghana. The pre-investment studies shall include (i) Feasibility Study; (ii) Line Route Survey; and (iii) Environmental and Social Impact Assessment (ESIA); (iv) Preparation of Pre-qualification and Functional Bidding Documents. |
Original sector | Energy |
Budget |
Location
Country | World |
Source
Source | African Development Bank (AfDB) |
URL |
More Details
Record type | Project |
Sector | Power Transmission, Power Generation (CCGT), Road, Government |
Article published date | 2025-03-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Transmission projects in Multinational
- Multinational - The Interconnection of Electric Grids of Nile Equatorial Lakes Countries (Grant to the Republic of Burundi)
- Multinational- Ruzizi III regional hydropower plant project
- Multinational- Ruzizi III regional hydropower plant project (Rwanda)
- Multinational - Uganda – DRC Power Transmission Study
- Multinational - The Interconnection of Electric Grids of Nile Equatorial Lakes Countries (Supplementary Loan to the Republic of Uganda)
- Multinational - Enhancing post-pandemic resilience and AfCTFA participation by developing SME and private sector
- Multinational - Côte d’Ivoire, Liberia, Sierra Leone and Guinea (CLSG) Electricity Networks Interconnection Project
- Multinational - Desert to Power Initiative West Africa Regional Energy Program – Phase I
