logo

Multinational - 330 KV Ghana – Burkina – Mali Interconnection Project Study

Sector: Road • Location: Multinational

Source: African Development Bank (AfDB)

Project

This intervention concerns the 330 KV Ghana – Burkina – Mali Interconnection Project Study. The project comprises a double circuit high voltage transmission line from Bolgatanga (Ghana) to Sikasso (Mali) through Bobo Dioulasso (Burkina). It shall facilitate power exchanges between Ghana, Burkina and Mali and among other countries of the ECOWAS region and reinforce the stability and reliability of

Project Information FAQ

Project Information

4 Q
The project “Multinational - 330 KV Ghana – Burkina – Mali Interconnection Project Study” is an infrastructure initiative in the Road sector, located in Multinational. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

This intervention concerns the 330 KV Ghana – Burkina – Mali Interconnection Project Study. The project comprises a double circuit high voltage transmission line from Bolgatanga (Ghana) to Sikasso (Mali) through Bobo Dioulasso (Burkina). It shall facilitate power exchanges between Ghana, Burkina and Mali and among other countries of the ECOWAS region and reinforce the stability and reliability of the WAPP interconnected system. The 330 kV WAPP Ghana – Burkina – Mali Interconnection Project shall reinforce the energy supply capacities of Mali (EDM-SA) and Burkina Faso (SONABEL) through the diversification of their mode of electricity provision. It shall also increase reliability for power supply to Ouagadougou given that it shall represent an alternate path for importations from Cote d’Ivoire as well as Ghana. The pre-investment studies shall include (i) Feasibility Study; (ii) Line Route Survey; and (iii) Environmental and Social Impact Assessment (ESIA); (iv) Preparation of Pre-qualification and Functional Bidding Documents.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data