Multinational - Arusha-Holili/Taveta-Voi Road Project
Sector: Raw Materials • Location: Multinational
Source: African Development Bank (AfDB)
The Arusha-Holili/Taveta-Voi Road is a transport corridor of the East African Region that links the Northern Corridor at Voi to the Central Corridor across the common border at Holili/Taveta through Arusha, Babati to Dodoma and Singida. The project comprises: (a) civil works for: (i) the construction of the Arusha-Bypass (42.4km) and dualling of the Sakina-Tengeru section (14.1km), and constructio
- Sector
- Raw Materials, Education, Hotel, Road, Government
- Location
- World
- Updated
- 22 Jul 2026
- Source
- African Development Bank (AfDB)
ConstructChat
Ask ConstructChat about Multinational - Arusha-Holili/Taveta-Voi Road Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Arusha-Holili/Taveta-Voi Road is a transport corridor of the East African Region that links the Northern Corridor at Voi to the Central Corridor across the common border at Holili/Taveta through Arusha, Babati to Dodoma and Singida. The project comprises: (a) civil works for: (i) the construction of the Arusha-Bypass (42.4km) and dualling of the Sakina-Tengeru section (14.1km), and construction of two roadside amenities at Tengeru, one on either side of the dual carriageway in Tanzania; (ii) upgrading of the Taveta-Mwatate (89km); and construction of the Taveta Bypass (12km) and two roadside amenities one each at Bura and Maktau along the Mwatate-Taveta road in Kenya; (b) consulting services for: (i) supervision of the civil works; (ii) road safety; (iii) sensitisation and mitigation measures for HIV/AIDS, STI, TB and gender; (iv) baseline data collection and monitoring of ESMP implementation; and (v) technical and financial audits; (c) technical assistance for road safety in Kenya; (d) trade facilitation program; and (e) compensation and resettlement. The project's total cost net of taxes is UA 173.86 million. The project is co-financed by the Bank Group (89.1%), the Government of Tanzania (4.7%), the Government of Kenya (5.9%) and the Africa Trade Fund (0.3%). It will be implemented over a five year period (2013-2018). |
Original sector | Transport & Storage |
Budget |
Location
Country | World |
Source
Source | African Development Bank (AfDB) |
URL |
More Details
Record type | Project |
Sector | Raw Materials, Education, Hotel, Road, Government |
Article published date | 2025-12-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Raw Materials projects in Multinational
- Multinational - Integrated Programme for Development and Adaptation to Climate Change in the Basin of Niger (PIDACC)
- Multinational Tanzania/ Rwanda - Feasibility Study of the Isaka-Kigali Railway Project
- Multinational - Sustainable Management of Endemic Ruminant Livestock in West Africa
- Multinational- Ruzizi III regional hydropower plant project (Rwanda)
- Democratic Republic of Congo - Geographically-Integrated ECOMAKALA+ REDD Pilot Project
- PROJET DE GESTION DURABLE DU BETAIL RUMINANT ENDEMIQUE EN AFRIQUE DE L'OUEST(SENEGAL)
- Multinational - Development of forest byproducts and reforestation of degraded areas in central Africa
- Multinational - Sixth Line of Credit to East African Development Bank (EADB)
