logo
Project

Multinational - Arusha-Holili/Taveta-Voi Road Project

Sector: Raw Materials • Location: Multinational

Source: African Development Bank (AfDB)

The Arusha-Holili/Taveta-Voi Road is a transport corridor of the East African Region that links the Northern Corridor at Voi to the Central Corridor across the common border at Holili/Taveta through Arusha, Babati to Dodoma and Singida. The project comprises: (a) civil works for: (i) the construction of the Arusha-Bypass (42.4km) and dualling of the Sakina-Tengeru section (14.1km), and constructio

Sector
Raw Materials, Education, Hotel, Road, Government
Location
World
Updated
22 Jul 2026
Source
African Development Bank (AfDB)

ConstructChat

Ask ConstructChat about Multinational - Arusha-Holili/Taveta-Voi Road Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Multinational - Arusha-Holili/Taveta-Voi Road Project” is an infrastructure initiative in the Raw Materials sector, located in Multinational. Taiyo aggregates data on it from African Development Bank (AfDB).

Participants

Sponsoring Agency

Status

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Arusha-Holili/Taveta-Voi Road is a transport corridor of the East African Region that links the Northern Corridor at Voi to the Central Corridor across the common border at Holili/Taveta through Arusha, Babati to Dodoma and Singida. The project comprises: (a) civil works for: (i) the construction of the Arusha-Bypass (42.4km) and dualling of the Sakina-Tengeru section (14.1km), and construction of two roadside amenities at Tengeru, one on either side of the dual carriageway in Tanzania; (ii) upgrading of the Taveta-Mwatate (89km); and construction of the Taveta Bypass (12km) and two roadside amenities one each at Bura and Maktau along the Mwatate-Taveta road in Kenya; (b) consulting services for: (i) supervision of the civil works; (ii) road safety; (iii) sensitisation and mitigation measures for HIV/AIDS, STI, TB and gender; (iv) baseline data collection and monitoring of ESMP implementation; and (v) technical and financial audits; (c) technical assistance for road safety in Kenya; (d) trade facilitation program; and (e) compensation and resettlement. The project's total cost net of taxes is UA 173.86 million. The project is co-financed by the Bank Group (89.1%), the Government of Tanzania (4.7%), the Government of Kenya (5.9%) and the Africa Trade Fund (0.3%). It will be implemented over a five year period (2013-2018).

Original sector

Transport & Storage

Budget

Location

Country

World

Source

Source

African Development Bank (AfDB)

URL

More Details

Record type

Project

Sector

Raw Materials, Education, Hotel, Road, Government

Article published date

2025-12-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project