logo
Project

Multinational - Baro-Akobo-Sobat multipurpose water resources development study project

Sector: Residential • Location: Multinational

Source: African Development Bank (AfDB)

The present project is a technical assistance from the African Water Facility (AWF) and the NEPAD Infrastructure Project Preparation Facility (NEPAD-IPPF) to the Eastern Nile Countries (Egypt, Sudan, and Ethiopia) for conducting the preparation study of the Baro-Akobo-Sobat (BAS) Multipurpose Water Resources Development. The BAS project has been formulated to address underdevelopment and to utiliz

Sector
Residential, Commercial, Water Supply and Storage, Power Generation (CCGT), Hydro, Road, Government
Location
World
Updated
22 Jul 2026
Source
African Development Bank (AfDB)

ConstructChat

Ask ConstructChat about Multinational - Baro-Akobo-Sobat multipurpose water resources development study project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Multinational - Baro-Akobo-Sobat multipurpose water resources development study project” is an infrastructure initiative in the Residential sector, located in Multinational. Taiyo aggregates data on it from African Development Bank (AfDB).

Participants

Sponsoring Agency

Status

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The present project is a technical assistance from the African Water Facility (AWF) and the NEPAD Infrastructure Project Preparation Facility (NEPAD-IPPF) to the Eastern Nile Countries (Egypt, Sudan, and Ethiopia) for conducting the preparation study of the Baro-Akobo-Sobat (BAS) Multipurpose Water Resources Development. The BAS project has been formulated to address underdevelopment and to utilize water resources as an engine for socio-economic development of the region. The BAS project targets an area emerging from conflict (on the South Sudanese part) and lagging behind other regions (even on the Ethiopian side) in all socio-economic development indicators. The project encompasses activities structured into four output areas, namely: (1) Development of an integrated water resources management and development plan for the BAS sub-basin based on a comprehensive assessment of options through a Strategic Social and Environmental Assessment (SSEA) ; (2) Identification of investment packages and feasibility study of selected priority investment projects with win-win benefits and that build trust and confidence among the Eastern Nile countries; (3) Project identification of medium and long-term multi-purpose development projects (water supply and sanitation, hydropower, irrigation, navigation, flood control); and (4) Stakeholder consultation and engagement including engagement of potential financing agencies as well as the private sector in resource mobilization for implementation of short-term projects and for project preparation of medium and long-term projects. The project will be implemented over a period of 36 months and participate in fostering climate variability resilience in a neighboring region. The total cost of the project is estimated at €3,050,000, made up mainly of consultancy services for undertaking the study.

Original sector

Water Supply & Sanitation

Budget

Location

Country

World

Source

Source

African Development Bank (AfDB)

URL

More Details

Record type

Project

Sector

Residential, Commercial, Water Supply and Storage, Power Generation (CCGT), Hydro, Road, Government

Article published date

2025-03-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project