Multinational - Baro-Akobo-Sobat multipurpose water resources development study project
Sector: Water Supply and Storage • Location: Multinational
Source: African Development Bank (AfDB)
The present project is a technical assistance from the African Water Facility (AWF) and the NEPAD Infrastructure Project Preparation Facility (NEPAD-IPPF) to the Eastern Nile Countries (Egypt, Sudan, and Ethiopia) for conducting the preparation study of the Baro-Akobo-Sobat (BAS) Multipurpose Water Resources Development. The BAS project has been formulated to address underdevelopment and to utiliz
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Obfuscated Data |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The present project is a technical assistance from the African Water Facility (AWF) and the NEPAD Infrastructure Project Preparation Facility (NEPAD-IPPF) to the Eastern Nile Countries (Egypt, Sudan, and Ethiopia) for conducting the preparation study of the Baro-Akobo-Sobat (BAS) Multipurpose Water Resources Development. The BAS project has been formulated to address underdevelopment and to utilize water resources as an engine for socio-economic development of the region. The BAS project targets an area emerging from conflict (on the South Sudanese part) and lagging behind other regions (even on the Ethiopian side) in all socio-economic development indicators. The project encompasses activities structured into four output areas, namely: (1) Development of an integrated water resources management and development plan for the BAS sub-basin based on a comprehensive assessment of options through a Strategic Social and Environmental Assessment (SSEA) ; (2) Identification of investment packages and feasibility study of selected priority investment projects with win-win benefits and that build trust and confidence among the Eastern Nile countries; (3) Project identification of medium and long-term multi-purpose development projects (water supply and sanitation, hydropower, irrigation, navigation, flood control); and (4) Stakeholder consultation and engagement including engagement of potential financing agencies as well as the private sector in resource mobilization for implementation of short-term projects and for project preparation of medium and long-term projects. The project will be implemented over a period of 36 months and participate in fostering climate variability resilience in a neighboring region. The total cost of the project is estimated at €3,050,000, made up mainly of consultancy services for undertaking the study. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Water Supply and Storage projects in Multinational
- Multinational (Democratic Republic of Congo / Angola) - The Democratic Republic of Congo - Angola Trans-National Economic Corridor Construction Project – Phase 1
- Multinational - Post Cyclone Idai and Kenneth Emergency Recovery and Resilience Programme (PCIREP) – Mozambique
- Multinational - Interconnection of the Electric Grids of the Nile Equatorial Lakes Countries
- Multinational - Project to Interconnect the Power Grids from the Boali Hydro-Power System - Phase I
- Multinational (Cameroon - Nigeria) - Transport Facilitation Program Corridor - Bamenda-Enugu- (PAGODA Supplemental Grant)
- Multinational - Baynes Hydro Power Project between Angola and Namibia 600 MW Advisory - Angola
- Multinational- Ruzizi III regional hydropower plant project (Burundi)
- Multinational - Feasibility study of the Nyimur Multipurpose Water Resources Project
