Multinational - Baro-Akobo-Sobat multipurpose water resources development study project
One of 4,322 projects Taiyo tracks in Multinational.
Source: African Development Bank (AfDB)
The present project is a technical assistance from the African Water Facility (AWF) and the NEPAD Infrastructure Project Preparation Facility (NEPAD-IPPF) to the Eastern Nile Countries (Egypt, Sudan, and Ethiopia) for conducting the preparation study of the Baro-Akobo-Sobat (BAS) Multipurpose Water Resources Development. The BAS project has been formulated to address underdevelopment and to utiliz
- Sector
- Residential, Commercial, Water Supply and Storage, Power Generation (CCGT), Hydro, Government
- Location
- World
- Updated
- 22 Jul 2026
- Source
- African Development Bank (AfDB)
ConstructChat
Ask ConstructChat about Multinational - Baro-Akobo-Sobat multipurpose water resources development study project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The present project is a technical assistance from the African Water Facility (AWF) and the NEPAD Infrastructure Project Preparation Facility (NEPAD-IPPF) to the Eastern Nile Countries (Egypt, Sudan, and Ethiopia) for conducting the preparation study of the Baro-Akobo-Sobat (BAS) Multipurpose Water Resources Development. The BAS project has been formulated to address underdevelopment and to utilize water resources as an engine for socio-economic development of the region. The BAS project targets an area emerging from conflict (on the South Sudanese part) and lagging behind other regions (even on the Ethiopian side) in all socio-economic development indicators. The project encompasses activities structured into four output areas, namely: (1) Development of an integrated water resources management and development plan for the BAS sub-basin based on a comprehensive assessment of options through a Strategic Social and Environmental Assessment (SSEA) ; (2) Identification of investment packages and feasibility study of selected priority investment projects with win-win benefits and that build trust and confidence among the Eastern Nile countries; (3) Project identification of medium and long-term multi-purpose development projects (water supply and sanitation, hydropower, irrigation, navigation, flood control); and (4) Stakeholder consultation and engagement including engagement of potential financing agencies as well as the private sector in resource mobilization for implementation of short-term projects and for project preparation of medium and long-term projects. The project will be implemented over a period of 36 months and participate in fostering climate variability resilience in a neighboring region. The total cost of the project is estimated at €3,050,000, made up mainly of consultancy services for undertaking the study. |
Original sector | Water Supply & Sanitation |
Budget |
Location
Country | World |
Source
Source | African Development Bank (AfDB) |
URL |
More Details
Record type | Project |
Sector | Residential, Commercial, Water Supply and Storage, Power Generation (CCGT), Hydro, Government |
Article published date | 2025-12-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Residential projects in Multinational
- Multinational - Study on the Abidjan - Lagos Highway Corridor Development Project -
- Multinational - Post-Ebola Recovery Social Investment Fund Project (Liberia)
- Multinational - Study into the contribution of the Jewelry Manufacturing and its Impact on Value Addition, Job Creation, and the Economic Empowerment of Women and Youth
- Multinational - Pointe-Noire-Brazzaville-Bangui-Ndjamena Multimodal Transport Corridor Development Project, Phase I
- Multinational - Mano River Union Road Development and Transport Facilitation Programme, Phase III-Sierra Leone
- Multinational - (Burundi-Rwanda) - Project to Develop Roads (Mugina-Mabanda-Lake Nyanza and Rubavu-Gisiza) and facilitate transport on the North-South Corridor - Phase III
- Multinational - Transition support facility for investments in country food and agriculture delivery compacts in transition states in Central Africa
- Multinational - Bissau - Dakar Road Corridor Improvement Project - Phase 1 - Farim-Tanaff-Sandinieri Road Development
