Multinational - Baynes Hydro Power Project 400 KV Transmission
Sector: Commercial • Location: Multinational
Source: African Development Bank (AfDB)
The proposed operation concerns a grant not exceeding US$ 1,568,600 to Southern African Power Pool (SAPP) on behalf of the national power utilities, RNT and NamPower for the purpose of conducting the pre-investment techno-economic studies of the Baynes Hydro Power 400 kV Transmission Lines Project. The Baynes Hydro-Power Plant (HPP) on the Kunene (Cunene) River between Namibia and Angola will have
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Obfuscated Data |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The proposed operation concerns a grant not exceeding US$ 1,568,600 to Southern African Power Pool (SAPP) on behalf of the national power utilities, RNT and NamPower for the purpose of conducting the pre-investment techno-economic studies of the Baynes Hydro Power 400 kV Transmission Lines Project. The Baynes Hydro-Power Plant (HPP) on the Kunene (Cunene) River between Namibia and Angola will have an installed capacity of 600 MW, with 300 MW allocated to Namibia and 300 MW allocated to Angola. The project directly integrates into the Angola – Namibia (ANNA) regional interconnector project, interconnecting Angola to the SAPP. This will be a green-field project. Technical studies for the transmission lines and associated substations are essential for the evacuation of power from the Baynes HPP which has Feasibility Studies that are almost complete. Strategically, the implementation and realisation of the project will promote regional cooperation for development and optimal utilisation of energy resources within the sub-region. Further, specifically in this case, this regional project will influence the implementation of the least-cost projects and coordination of this regional investment will involve significant savings in NPV terms for the region. The project will help deliver both physical (Interconnector and associated hardware) and institutional (agreements, rules, harmonized grid-codes, processes, skills, power trade, etc.) infrastructure. The total implementation period is estimated to Twenty-four months (24) from approval comprising eighteen (18) months for conducting the studies, holding validation workshops and compiling reports preceded by six (6) months for the procurement process including negotiation and contract award. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
