Multinational - Baynes Hydro Power Project 400 KV Transmission

Sector: Commercial • Location: Multinational

Source: African Development Bank (AfDB)

The proposed operation concerns a grant not exceeding US$ 1,568,600 to Southern African Power Pool (SAPP) on behalf of the national power utilities, RNT and NamPower for the purpose of conducting the pre-investment techno-economic studies of the Baynes Hydro Power 400 kV Transmission Lines Project. The Baynes Hydro-Power Plant (HPP) on the Kunene (Cunene) River between Namibia and Angola will have

Sector
Commercial, Power Generation (CCGT), Hydro, Government
Location
World
Updated
22 Jul 2026
Source
African Development Bank (AfDB)

ConstructChat

Ask ConstructChat about Multinational - Baynes Hydro Power Project 400 KV Transmission

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Multinational - Baynes Hydro Power Project 400 KV Transmission” is an infrastructure initiative in the Commercial sector, located in Multinational. Taiyo aggregates data on it from African Development Bank (AfDB).

Participants

Sponsoring Agency

Status

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The proposed operation concerns a grant not exceeding US$ 1,568,600 to Southern African Power Pool (SAPP) on behalf of the national power utilities, RNT and NamPower for the purpose of conducting the pre-investment techno-economic studies of the Baynes Hydro Power 400 kV Transmission Lines Project. The Baynes Hydro-Power Plant (HPP) on the Kunene (Cunene) River between Namibia and Angola will have an installed capacity of 600 MW, with 300 MW allocated to Namibia and 300 MW allocated to Angola. The project directly integrates into the Angola – Namibia (ANNA) regional interconnector project, interconnecting Angola to the SAPP. This will be a green-field project. Technical studies for the transmission lines and associated substations are essential for the evacuation of power from the Baynes HPP which has Feasibility Studies that are almost complete. Strategically, the implementation and realisation of the project will promote regional cooperation for development and optimal utilisation of energy resources within the sub-region. Further, specifically in this case, this regional project will influence the implementation of the least-cost projects and coordination of this regional investment will involve significant savings in NPV terms for the region. The project will help deliver both physical (Interconnector and associated hardware) and institutional (agreements, rules, harmonized grid-codes, processes, skills, power trade, etc.) infrastructure. The total implementation period is estimated to Twenty-four months (24) from approval comprising eighteen (18) months for conducting the studies, holding validation workshops and compiling reports preceded by six (6) months for the procurement process including negotiation and contract award.

Original sector

Energy

Budget

Location

Country

World

Source

Source

African Development Bank (AfDB)

URL

More Details

Record type

Project

Sector

Commercial, Power Generation (CCGT), Hydro, Government

Article published date

2025-03-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project