logo

Multinational - Baynes Hydro Power Project between Angola and Namibia 600 MW Advisory - Angola

Sector: Power Generation (CCGT) • Location: Multinational

Source: African Development Bank (AfDB)

Project

The Bayne’s Hydropower Project (HPP) is a priority project identified, by the Program for Infrastructure Development in Africa (PIDA PAP2), and the SADC Revised Regional Indicative Strategic Development Plan (RISDP) 2020-2030. The project is well anchored on the operational priorities of the SADC/COMESA regional infrastructure development master plans which place emphasis on: (i) infrastructure de

Project Information FAQ

Project Information

4 Q
The project “Multinational - Baynes Hydro Power Project between Angola and Namibia 600 MW Advisory - Angola” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Multinational. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Bayne’s Hydropower Project (HPP) is a priority project identified, by the Program for Infrastructure Development in Africa (PIDA PAP2), and the SADC Revised Regional Indicative Strategic Development Plan (RISDP) 2020-2030. The project is well anchored on the operational priorities of the SADC/COMESA regional infrastructure development master plans which place emphasis on: (i) infrastructure development; and (ii) enhancing institutional capacity and skills. Based on the feasibility studies, the project is viable, and a PPP model has been recommended with an estimated value of USD 1.34 billion. The techno-economic studies, that are currently being updated, were completed in 2011 and were found to be technically and financially feasible. This operation is therefore responding to strengthening the studies to gain the confidence of the private sector by ensuring its participation to leverage the already constrained government fiscal spaces. The purpose of the technical assistance is to engage an Independent Panel of Experts (IPoE) to review and validate all the design work according to the best international standards. The techno economic studies that are being updated, and the bidding document that is expected to be prepared by the transaction advisor by the Africa Legal Support Facility (ALSF), are all subject to the review by the IPoE. The key areas subjected to the review of the IPoE includes: all engineering, economic aspects with their pros and cons for options selection (dam type, height, power generation facility and capacity, etc.). The Technical Assistance will be implemented over a period of three (3) years between January 2022 to January 2025 following approval by the Bank. The total estimated cost is UA 575,000 of which UA 500,000 is provided by the Bank under the Middle-Income Countries Technical Assistance Fund (MIC-TAF) Grant.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data