logo
Project

Multinational - Baynes Hydro Power Project between Angola and Namibia 600 MW Advisory

Sector: Power Generation (CCGT) • Location: Multinational

Source: African Development Bank (AfDB)

The Bayne’s Hydropower Project (HPP) is a priority project identified, by the Program for Infrastructure Development in Africa (PIDA PAP2), and the SADC Revised Regional Indicative Strategic Development Plan (RISDP) 2020-2030. The project is well anchored on the operational priorities of the SADC/COMESA regional infrastructure development master plans which place emphasis on: (i) infrastructure de

Sector
Power Generation (CCGT), Hydro, Water Supply and Storage, Government
Location
World
Updated
22 Jul 2026
Source
African Development Bank (AfDB)

ConstructChat

Ask ConstructChat about Multinational - Baynes Hydro Power Project between Angola and Namibia 600 MW Advisory

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Multinational - Baynes Hydro Power Project between Angola and Namibia 600 MW Advisory” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Multinational. Taiyo aggregates data on it from African Development Bank (AfDB).

Participants

Sponsoring Agency

Status

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Bayne’s Hydropower Project (HPP) is a priority project identified, by the Program for Infrastructure Development in Africa (PIDA PAP2), and the SADC Revised Regional Indicative Strategic Development Plan (RISDP) 2020-2030. The project is well anchored on the operational priorities of the SADC/COMESA regional infrastructure development master plans which place emphasis on: (i) infrastructure development; and (ii) enhancing institutional capacity and skills. Based on the feasibility studies, the project is viable, and a PPP model has been recommended with an estimated value of USD 1.34 billion. The techno-economic studies, that are currently being updated, were completed in 2011 and were found to be technically and financially feasible. This operation is therefore responding to strengthening the studies to gain the confidence of the private sector by ensuring its participation to leverage the already constrained government fiscal spaces. The purpose of the technical assistance is to engage an Independent Panel of Experts (IPoE) to review and validate all the design work according to the best international standards. The techno economic studies that are being updated, and the bidding document that is expected to be prepared by the transaction advisor by the Africa Legal Support Facility (ALSF), are all subject to the review by the IPoE. The key areas subjected to the review of the IPoE includes: all engineering, economic aspects with their pros and cons for options selection (dam type, height, power generation facility and capacity, etc.). The Technical Assistance will be implemented over a period of three (3) years between January 2022 to January 2025 following approval by the Bank. The total estimated cost is UA 575,000 of which UA 500,000 is provided by the Bank under the Middle-Income Countries Technical Assistance Fund (MIC-TAF) Grant.

Original sector

Energy

Budget

Location

Country

World

Source

Source

African Development Bank (AfDB)

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Hydro, Water Supply and Storage, Government

Article published date

2025-03-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project