logo
Project

Multinational - Boke-Quebo Road Improvement Project (Phase 1)

Sector: Raw Materials • Location: Multinational

Source: African Development Bank (AfDB)

The Boké-Québo road is a link of national and regional importance connecting Guinea and Guinea-Bissau and serving an area with strong agricultural and mining potential. The road is part of the Dakar –Lagos Road Corridor or Trans-African Highway 7 (TAH 7) identified as the backbone for the sub-region’s economic and social development. This corridor is considered to be one of the top priorities of t

Sector
Raw Materials, Bridge, Education, Cement, Road, Government
Location
World
Updated
22 Jul 2026
Source
African Development Bank (AfDB)

ConstructChat

Ask ConstructChat about Multinational - Boke-Quebo Road Improvement Project (Phase 1)

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Multinational - Boke-Quebo Road Improvement Project (Phase 1)” is an infrastructure initiative in the Raw Materials sector, located in Multinational. Taiyo aggregates data on it from African Development Bank (AfDB).

Participants

Sponsoring Agency

Status

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Boké-Québo road is a link of national and regional importance connecting Guinea and Guinea-Bissau and serving an area with strong agricultural and mining potential. The road is part of the Dakar –Lagos Road Corridor or Trans-African Highway 7 (TAH 7) identified as the backbone for the sub-region’s economic and social development. This corridor is considered to be one of the top priorities of the African Union’s Programme for Infrastructure Development in Africa (PIDA) and the ECOWAS Regional Transport Facilitation Programme, reference no. CWTR-38/99. It is a dirt road in very bad condition, depriving a high proportion of the population in the area of access to basic services (health, education, and markets) and preventing them from tapping into the area’s potential. The Boké-Québo Road Improvement Project will complete the missing portion of the land link between Conakry and Bissau, the respective capitals of Guinea and Guinea-Bissau. It consists of : (i) the improvement and asphalting of 107 km of road, 86 km of which are in Guinea and 21 km in Guinea-Bissau, in accordance with ECOWAS standards (7-metre road surface flanked by 1.5-metre shoulders in bituminous concrete) ; (ii) the construction of two bridges in Guinea with a total length of 364 lm (Tinguilinta and Kogon) and repairs to defects identified on 5 bridges in Guinea-Bissau. The total cost for the entire project is estimated at UA 99.08 million, or EUR 117.29 million. In light of the cost of the entire project and available financing, it was decided to implement it gradually in phases. The Boké-Québo Road improvement works are broken down into 3 lots : (i) lot 1 from KP 0 (Boké) to KP 45 including the construction of a new bridge over the Tinginlinta River on the Guinean side ; (ii) lot 2 from KP 45 to the border with Guinea-Bissau including the construction of a bridge over the Kogon River to replace the ferry on the Guinean side ; and (iii) lot 3 from the Guinean border to Québo on the Guinea-Bissau side. The proposed PHASE 1, with a duration of 4 years and an estimated total cost of UA 67, 52 million (i.e. EUR 79, 94 million), will consist in carrying out lots 2 and 3. PHASE 2 will concern lot 1.

Original sector

Transport & Storage

Budget

Location

Country

World

Source

Source

African Development Bank (AfDB)

URL

More Details

Record type

Project

Sector

Raw Materials, Bridge, Education, Cement, Road, Government

Article published date

2025-03-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project