Multinational - Burundi-Rwanda Power Grid Interconnection Project for NELSAP
The status, timeline and source of this project. A free account opens every field.
Source: African Development Bank (AfDB)
The present intervention concerns the Burundi-Rwanda Power Grid Interconnection Project. It falls within the Multinational Power Grid Interconnection Project for the Nile Equatorial Lakes Countries (PMIREL-PLEN or NELSAP). The project involves constructing 140.7 km of 220 kV line initially operated at 110 kV (79.2 km in Burundi and 61.5 km in Rwanda) and two 220/30 kV sub-stations, and extending t
- Sector
- Power Generation (CCGT), Government
- Location
- World
- Updated
- 22 Jul 2026
- Source
- African Development Bank (AfDB)
ConstructChat
Ask ConstructChat about Multinational - Burundi-Rwanda Power Grid Interconnection Project for NELSAP
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The present intervention concerns the Burundi-Rwanda Power Grid Interconnection Project. It falls within the Multinational Power Grid Interconnection Project for the Nile Equatorial Lakes Countries (PMIREL-PLEN or NELSAP). The project involves constructing 140.7 km of 220 kV line initially operated at 110 kV (79.2 km in Burundi and 61.5 km in Rwanda) and two 220/30 kV sub-stations, and extending two 110 kV sub-stations between Gitega and Ngozi towns in Burundi, and Butaré and Kigoma towns in Rwanda. It will help to improve the living conditions of the population, as well as the quality of the economic and social development framework by increasing the supply of affordable power. It will also contribute to enhancing the integration of the regional electricity market. The project comprises three main components, namely: (i) construction of transmission line; (ii) rural electrification; and (iii) project management. |
Original sector | Energy |
Budget |
Location
Country | World |
Source
Source | African Development Bank (AfDB) |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Government |
Article published date | 2025-12-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in Multinational
- Multinational - The Interconnection of Electric Grids of Nile Equatorial Lakes Countries (Grant to the Republic of Burundi)
- Ghana - Togo - Benin Power Interconnect
- Multinational- Ruzizi III regional hydropower plant project
- Multinational - Scaling-up the Clean Cooking Industry in Africa
- Multinational- Ruzizi III regional hydropower plant project (Rwanda)
- Multinational - Kigali/Bujumbura oil products pipeline feasability study
- Multinational - Uganda – DRC Power Transmission Study
- Multinational - Study on the Cameroon-Chad Electricity Interconnection Project
