logo
Project

Multinational - Cameroon and Chad Power Interconnection Project (Cameroon component)

Sector: Commercial • Location: Multinational

Source: African Development Bank (AfDB)

The Cameroon-Chad Power Interconnection Project stems from the desire of both countries to optimize the use of their energy resources by integrating their power generation, transmission and distribution infrastructure. It will involve the construction of: (i) a 225 kV high-voltage (HV) main transmission line between Ngaoundéré and Maroua (Cameroon) and N’Djamena (Chad); (ii) a 225 kV high-voltage

Sector
Commercial, Power Transmission, Power Generation (CCGT), Government
Location
World
Updated
22 Jul 2026
Source
African Development Bank (AfDB)

ConstructChat

Ask ConstructChat about Multinational - Cameroon and Chad Power Interconnection Project (Cameroon component)

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Multinational - Cameroon and Chad Power Interconnection Project (Cameroon component)” is an infrastructure initiative in the Commercial sector, located in Multinational. Taiyo aggregates data on it from African Development Bank (AfDB).

Participants

Sponsoring Agency

Status

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Cameroon-Chad Power Interconnection Project stems from the desire of both countries to optimize the use of their energy resources by integrating their power generation, transmission and distribution infrastructure. It will involve the construction of: (i) a 225 kV high-voltage (HV) main transmission line between Ngaoundéré and Maroua (Cameroon) and N’Djamena (Chad); (ii) a 225 kV high-voltage link between Maroua (Cameroon), Bongor, Guelendeng and N’Djamena (Chad); (iii) related high-voltage (HV)/medium-voltage (MV) transformer stations; and (iv) rural electrification distribution networks along transmission line corridors. In total, about 1 024 kilometres of HV transmission lines (786 kilometres in Cameroon and 238 kilometres in Chad) will be constructed and 478 localities along these lines (409 of them in Cameroun and 69 in Chad) electrified. It is one of Central Africa’s priority integration projects.

Original sector

Energy

Budget

Location

Country

World

Source

Source

African Development Bank (AfDB)

URL

More Details

Record type

Project

Sector

Commercial, Power Transmission, Power Generation (CCGT), Government

Article published date

2025-03-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project