Multinational - Cameroon and Chad Power Interconnection Project (Chad component)
The status, timeline and source of this project. A free account opens every field.
Source: African Development Bank (AfDB)
The present intervention concerns the Cameroon-Chad Power Interconnection Project. It stems from the desire of both countries to optimize the use of their energy resources by integrating their power generation, transmission and distribution infrastructure. It will involve the construction of: (i) a 225 kV high-voltage (HV) main transmission line between Ngaoundéré and Maroua (Cameroon) and N’Djame
- Sector
- Power Transmission, Power Generation (CCGT), Government
- Location
- World
- Updated
- 22 Jul 2026
- Source
- African Development Bank (AfDB)
ConstructChat
Ask ConstructChat about Multinational - Cameroon and Chad Power Interconnection Project (Chad component)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The present intervention concerns the Cameroon-Chad Power Interconnection Project. It stems from the desire of both countries to optimize the use of their energy resources by integrating their power generation, transmission and distribution infrastructure. It will involve the construction of: (i) a 225 kV high-voltage (HV) main transmission line between Ngaoundéré and Maroua (Cameroon) and N’Djamena (Chad); (ii) a 225 kV high-voltage link between Maroua (Cameroon), Bongor, Guelendeng and N’Djamena (Chad); (iii) related high-voltage (HV)/medium-voltage (MV) transformer stations; and (iv) rural electrification distribution networks along transmission line corridors. In total, about 1 024 kilometres of HV transmission lines (786 kilometres in Cameroon and 238 kilometres in Chad) will be constructed and 478 localities along these lines (409 of them in Cameroun and 69 in Chad) electrified. It is one of Central Africa’s priority integration projects. Besides interconnecting the power generation and transmission infrastructure of Cameroon and Chad, thus significantly reducing the production costs of national electricity corporations, the project will, through the electrification of the localities along the interconnection lines, help to increase the electricity access rate in both countries, thus contributing to improving the living conditions of the population and reducing poverty. |
Original sector | Energy |
Budget |
Location
Country | World |
Source
Source | African Development Bank (AfDB) |
URL |
More Details
Record type | Project |
Sector | Power Transmission, Power Generation (CCGT), Government |
Article published date | 2025-03-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Transmission projects in Multinational
- Multinational - The Interconnection of Electric Grids of Nile Equatorial Lakes Countries (Grant to the Republic of Burundi)
- Multinational- Ruzizi III regional hydropower plant project
- Multinational- Ruzizi III regional hydropower plant project (Rwanda)
- Multinational - Uganda – DRC Power Transmission Study
- Multinational - The Interconnection of Electric Grids of Nile Equatorial Lakes Countries (Supplementary Loan to the Republic of Uganda)
- Multinational - Enhancing post-pandemic resilience and AfCTFA participation by developing SME and private sector
- Multinational - Côte d’Ivoire, Liberia, Sierra Leone and Guinea (CLSG) Electricity Networks Interconnection Project
- Multinational - Desert to Power Initiative West Africa Regional Energy Program – Phase I