Multinational - Continental Power System Master Plan Project (CMP)
The status, timeline and source of this project. A free account opens every field.
Source: African Development Bank (AfDB)
The proposed operation is a technical assistance support to the development of a Continental Power System Master Plan (CMP). The master plan will provide a roadmap for the eventual integration of the continent through the establishment of a sustainable integrated continental power transmission network, in the context of the African Union's Agenda 2063. The CMP has been designed to be developed in
- Sector
- Commercial, Power Transmission, Power Generation (CCGT), Government
- Location
- World
- Updated
- 22 Jul 2026
- Source
- African Development Bank (AfDB)
ConstructChat
Ask ConstructChat about Multinational - Continental Power System Master Plan Project (CMP)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The proposed operation is a technical assistance support to the development of a Continental Power System Master Plan (CMP). The master plan will provide a roadmap for the eventual integration of the continent through the establishment of a sustainable integrated continental power transmission network, in the context of the African Union's Agenda 2063. The CMP has been designed to be developed in two phases: the first phase focuses on the baseline study and the second phase on the development of the continental master plan. The baseline study was carried out with the support of the European Union Technical Assistance Facility (TAF-EU) for an amount of It was completed in October 2020. The Bank's current intervention is focused on the development of the master plan. The Project is structured around the following three (3) components: (i) Support to energy planning and modelling; (ii) Support for capacity building and institutional strengthening of AUDA-NEPAD and energy pools; (iii) Updating and development of the CAPP and COMELEC master plans, respectively, as well as institutional strengthening and development of regulatory, legal frameworks, among other aspects. The cost of the main activities related to the development of the continental power system master plan (Phase IIA) as shown in the table below is estimated at USD 17.5 million. |
Original sector | Energy |
Budget |
Location
Country | World |
Source
Source | African Development Bank (AfDB) |
URL |
More Details
Record type | Project |
Sector | Commercial, Power Transmission, Power Generation (CCGT), Government |
Article published date | 2025-03-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in Multinational
- Multinational - The Interconnection of Electric Grids of Nile Equatorial Lakes Countries (Grant to the Republic of Burundi)
- Multinational - Integrated Programme for Development and Adaptation to Climate Change in the Basin of Niger (PIDACC)
- Multinational - Scaling-up the Clean Cooking Industry in Africa
- Multinational - Study on the Abidjan - Lagos Highway Corridor Development Project -
- Multinational - Post-Ebola Recovery Social Investment Fund Project (Liberia)
- Multinational - Lake Victoria Water Supply and Sanitation Program - Phase II
- Multinational - Study into the contribution of the Jewelry Manufacturing and its Impact on Value Addition, Job Creation, and the Economic Empowerment of Women and Youth
- Multinational - Support to the control of communicable diseases such as HIV/AIDS, Tuberculose, Malaria.