logo
Project

Multinational - Continental Power System Master Plan Project (CMP)

One of 4,322 projects Taiyo tracks in Multinational.

Source: African Development Bank (AfDB)

The proposed operation is a technical assistance support to the development of a Continental Power System Master Plan (CMP). The master plan will provide a roadmap for the eventual integration of the continent through the establishment of a sustainable integrated continental power transmission network, in the context of the African Union's Agenda 2063. The CMP has been designed to be developed in

Sector
Commercial, Power Transmission, Power Generation (CCGT), Government
Location
World
Updated
22 Jul 2026
Source
African Development Bank (AfDB)

ConstructChat

Ask ConstructChat about Multinational - Continental Power System Master Plan Project (CMP)

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Multinational - Continental Power System Master Plan Project (CMP)” is an infrastructure initiative in the Commercial sector, located in Multinational. Taiyo aggregates data on it from African Development Bank (AfDB).

Participants

Sponsoring Agency

Status

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The proposed operation is a technical assistance support to the development of a Continental Power System Master Plan (CMP). The master plan will provide a roadmap for the eventual integration of the continent through the establishment of a sustainable integrated continental power transmission network, in the context of the African Union's Agenda 2063. The CMP has been designed to be developed in two phases: the first phase focuses on the baseline study and the second phase on the development of the continental master plan. The baseline study was carried out with the support of the European Union Technical Assistance Facility (TAF-EU) for an amount of It was completed in October 2020. The Bank's current intervention is focused on the development of the master plan. The Project is structured around the following three (3) components: (i) Support to energy planning and modelling; (ii) Support for capacity building and institutional strengthening of AUDA-NEPAD and energy pools; (iii) Updating and development of the CAPP and COMELEC master plans, respectively, as well as institutional strengthening and development of regulatory, legal frameworks, among other aspects. The cost of the main activities related to the development of the continental power system master plan (Phase IIA) as shown in the table below is estimated at USD 17.5 million.

Original sector

Energy

Budget

Location

Country

World

Source

Source

African Development Bank (AfDB)

URL

More Details

Record type

Project

Sector

Commercial, Power Transmission, Power Generation (CCGT), Government

Article published date

2025-12-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project