logo

Multinational - Detailed study project for the construction of the bridge over the Ntem River on the transnational road Kribi-Campo-Bata

Sector: Commercial • Location: Multinational

Source: African Development Bank (AfDB)

Project

The present detailed Study Project is an operation which focuses on the achievement of feasibility activities (studies and ancillary activities) related to the construction project of a bridge over Ntem River on the multinational Kribi-Campo-Bata road linking the Republics of Cameroon and Equatorial Guinea. These feasibility activities, with a total estimated cost at USD 2.5 million, are divided i

Project Information FAQ

Project Information

4 Q
The project “Multinational - Detailed study project for the construction of the bridge over the Ntem River on the transnational road Kribi-Campo-Bata” is an infrastructure initiative in the Commercial sector, located in Multinational. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The present detailed Study Project is an operation which focuses on the achievement of feasibility activities (studies and ancillary activities) related to the construction project of a bridge over Ntem River on the multinational Kribi-Campo-Bata road linking the Republics of Cameroon and Equatorial Guinea. These feasibility activities, with a total estimated cost at USD 2.5 million, are divided into five main components, namely: Engineering designs for the construction of the bridge, transport and trade facilitation measures along the target Corridor and defining an institutional framework for its implementation; Capacity building; Coordination and Project management actions; Organization of round tables for technical and financial partners; Conduct of audits of the study project accounts.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data