Multinational - EGL-technical assistance for RUZIZI IV planning studies (EU Grant)

Sector: Power Generation (CCGT) • Location: Multinational

Source: African Development Bank (AfDB)

This intervention relates to the Technical Assistance for Studies on Ruzizi Hydropower Plant Project IV. The preparatory activities should help to determine the best technical, economic, financial and socio-environmental option for the construction of the Ruzizi IV power plant. Ruzizi IV is one of the priority energy infrastructure projects identified by EGL, ECGLC and the Economic Community of Ce

Sector
Power Generation (CCGT), Hydro, Government
Location
World
Updated
22 Jul 2026
Source
African Development Bank (AfDB)

ConstructChat

Ask ConstructChat about Multinational - EGL-technical assistance for RUZIZI IV planning studies (EU Grant)

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Multinational - EGL-technical assistance for RUZIZI IV planning studies (EU Grant)” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Multinational. Taiyo aggregates data on it from African Development Bank (AfDB).

Participants

Sponsoring Agency

Status

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This intervention relates to the Technical Assistance for Studies on Ruzizi Hydropower Plant Project IV. The preparatory activities should help to determine the best technical, economic, financial and socio-environmental option for the construction of the Ruzizi IV power plant. Ruzizi IV is one of the priority energy infrastructure projects identified by EGL, ECGLC and the Economic Community of Central African States (ECCAS). A pre-feasibility study was conducted in 2010 on Ruzizi Project IV. As envisaged today, the Ruzizi IV hydropower plant will have a capacity of 287 MW that will enable it to fully tap the available hydropower potential of 500 MW on Ruzizi River where two power plants are already in operation, Ruzizi I (29.8 MW) and Ruzizi II (43.8 MW), and another is being constructed, Ruzizi III (147 MW), with Bank support. This operation will have three phases: (i) conduct of technical and environmental studies, as well as preparation of the bidding documents; (ii) conduct of studies on the institutional and financial framework and the economic and financial viability study; and (iii) preparatory activities for the project implementation, which includes technical, legal and financial assistance in negotiating the various agreements and associated contracts for the project implementation.

Original sector

Energy

Budget

Location

Country

World

Source

Source

African Development Bank (AfDB)

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Hydro, Government

Article published date

2025-03-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project