logo

Multinational - EGL-technical assistance for RUZIZI IV planning studies (EU Grant)

Sector: Power Generation (CCGT) • Location: Multinational

Source: African Development Bank (AfDB)

Project

This intervention relates to the Technical Assistance for Studies on Ruzizi Hydropower Plant Project IV. The preparatory activities should help to determine the best technical, economic, financial and socio-environmental option for the construction of the Ruzizi IV power plant. Ruzizi IV is one of the priority energy infrastructure projects identified by EGL, ECGLC and the Economic Community of Ce

Project Information FAQ

Project Information

4 Q
The project “Multinational - EGL-technical assistance for RUZIZI IV planning studies (EU Grant)” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Multinational. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

This intervention relates to the Technical Assistance for Studies on Ruzizi Hydropower Plant Project IV. The preparatory activities should help to determine the best technical, economic, financial and socio-environmental option for the construction of the Ruzizi IV power plant. Ruzizi IV is one of the priority energy infrastructure projects identified by EGL, ECGLC and the Economic Community of Central African States (ECCAS). A pre-feasibility study was conducted in 2010 on Ruzizi Project IV. As envisaged today, the Ruzizi IV hydropower plant will have a capacity of 287 MW that will enable it to fully tap the available hydropower potential of 500 MW on Ruzizi River where two power plants are already in operation, Ruzizi I (29.8 MW) and Ruzizi II (43.8 MW), and another is being constructed, Ruzizi III (147 MW), with Bank support. This operation will have three phases: (i) conduct of technical and environmental studies, as well as preparation of the bidding documents; (ii) conduct of studies on the institutional and financial framework and the economic and financial viability study; and (iii) preparatory activities for the project implementation, which includes technical, legal and financial assistance in negotiating the various agreements and associated contracts for the project implementation.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data