The electrical interconnection study of ECCAS member countries constitutes an essential instrument to give new impetus to sub-regional electrification. This study will enable ECCAS member countries to have a coherent electricity sub-sector development instrument, in particular by optimising means of generation and transportation. It lays the foundation for further cooperation and integration betwe

Sector
Power Generation (CCGT), Government
Location
World
Updated
22 Jul 2026
Source
African Development Bank (AfDB)

ConstructChat

Ask ConstructChat about Multinational - Electrical interconnection study of ECCAS member countries

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Multinational - Electrical interconnection study of ECCAS member countries” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Multinational. Taiyo aggregates data on it from African Development Bank (AfDB).

Participants

Sponsoring Agency

Status

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The electrical interconnection study of ECCAS member countries constitutes an essential instrument to give new impetus to sub-regional electrification. This study will enable ECCAS member countries to have a coherent electricity sub-sector development instrument, in particular by optimising means of generation and transportation. It lays the foundation for further cooperation and integration between countries of the sub-region and the development, for a greater number of people, of access to electricity. The study will be implemented in three phases, that is to say, the electrical interconnection preliminary study, the feasibility study of the reference interconnection schema and detailed engineering designs of projects for the priority programme. Its implementation is planned over a total of 24 months with a cost, net of taxes, estimated at about UA 2.69 million.

Original sector

Energy

Budget

Location

Country

World

Source

Source

African Development Bank (AfDB)

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Government

Article published date

2025-03-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project