logo

Multinational - Electrical interconnection study of ECCAS member countries

Sector: Power Generation (CCGT) • Location: Multinational

Source: African Development Bank (AfDB)

Project

The electrical interconnection study of ECCAS member countries constitutes an essential instrument to give new impetus to sub-regional electrification. This study will enable ECCAS member countries to have a coherent electricity sub-sector development instrument, in particular by optimising means of generation and transportation. It lays the foundation for further cooperation and integration betwe

Project Information FAQ

Project Information

4 Q
The project “Multinational - Electrical interconnection study of ECCAS member countries” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Multinational. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The electrical interconnection study of ECCAS member countries constitutes an essential instrument to give new impetus to sub-regional electrification. This study will enable ECCAS member countries to have a coherent electricity sub-sector development instrument, in particular by optimising means of generation and transportation. It lays the foundation for further cooperation and integration between countries of the sub-region and the development, for a greater number of people, of access to electricity. The study will be implemented in three phases, that is to say, the electrical interconnection preliminary study, the feasibility study of the reference interconnection schema and detailed engineering designs of projects for the priority programme. Its implementation is planned over a total of 24 months with a cost, net of taxes, estimated at about UA 2.69 million.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data