Multinational - Electrical interconnection study of ECCAS member countries
One of 4,322 projects Taiyo tracks in Multinational.
Source: African Development Bank (AfDB)
The electrical interconnection study of ECCAS member countries constitutes an essential instrument to give new impetus to sub-regional electrification. This study will enable ECCAS member countries to have a coherent electricity sub-sector development instrument, in particular by optimising means of generation and transportation. It lays the foundation for further cooperation and integration betwe
- Sector
- Power Generation (CCGT), Government
- Location
- World
- Updated
- 22 Jul 2026
- Source
- African Development Bank (AfDB)
ConstructChat
Ask ConstructChat about Multinational - Electrical interconnection study of ECCAS member countries
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The electrical interconnection study of ECCAS member countries constitutes an essential instrument to give new impetus to sub-regional electrification. This study will enable ECCAS member countries to have a coherent electricity sub-sector development instrument, in particular by optimising means of generation and transportation. It lays the foundation for further cooperation and integration between countries of the sub-region and the development, for a greater number of people, of access to electricity. The study will be implemented in three phases, that is to say, the electrical interconnection preliminary study, the feasibility study of the reference interconnection schema and detailed engineering designs of projects for the priority programme. Its implementation is planned over a total of 24 months with a cost, net of taxes, estimated at about UA 2.69 million. |
Original sector | Energy |
Budget |
Location
Country | World |
Source
Source | African Development Bank (AfDB) |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Government |
Article published date | 2025-12-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in Multinational
- Multinational - The Interconnection of Electric Grids of Nile Equatorial Lakes Countries (Grant to the Republic of Burundi)
- Ghana - Togo - Benin Power Interconnect
- Multinational- Ruzizi III regional hydropower plant project
- Multinational - Scaling-up the Clean Cooking Industry in Africa
- Multinational- Ruzizi III regional hydropower plant project (Rwanda)
- Multinational - Kigali/Bujumbura oil products pipeline feasability study
- Multinational - Uganda – DRC Power Transmission Study
- Multinational - Study on the Cameroon-Chad Electricity Interconnection Project
