Multinational - Establishment of a Regional Project Acceleration Unit in Central African Power Pool (CAPP)
One of 4,322 projects Taiyo tracks in Multinational.
Source: African Development Bank (AfDB)
The project seeks to establish a Projects Acceleration Unit in the Central African Power Pool (CAPP) that will be responsible for the early-stage project preparation and implementation supervision of priority regional power projects in the ECCAS region and bring them to “bankability expeditiously”. The project is directly targeted at the Central African Power Pool, but the benefits therefrom will
- Sector
- Power Generation (CCGT), Government, Automotive
- Location
- World
- Updated
- 22 Jul 2026
- Source
- African Development Bank (AfDB)
ConstructChat
Ask ConstructChat about Multinational - Establishment of a Regional Project Acceleration Unit in Central African Power Pool (CAPP)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project seeks to establish a Projects Acceleration Unit in the Central African Power Pool (CAPP) that will be responsible for the early-stage project preparation and implementation supervision of priority regional power projects in the ECCAS region and bring them to “bankability expeditiously”. The project is directly targeted at the Central African Power Pool, but the benefits therefrom will be enjoyed by all the power utilities in the ECCAS member states as well as the populations they serve. The eleven (11) member countries of CAPP include Angola, Burundi, Cameroon, Congo, Gabon, Equatorial Guinea, Central African Republic (CAR), Democratic Republic of Congo (DRC), Rwanda, Sao Tome and Principe, and Chad. The project is designed to address the challenge of weak regional project preparation capacity within the CAPP/PEAC to strengthen early-stage preparation activities. The project cost is estimated at USD 3.3 million and will be largely financed from the Banks resources of USD 3.0 million and CAPP Secretariat’s in-kind contribution of USD 0.3 million. The project unit will be operationalized within six months after the coming into force of the grant agreement and supported for the initial five years till December 2025. |
Original sector | Energy |
Budget |
Location
Country | World |
Source
Source | African Development Bank (AfDB) |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Government, Automotive |
Article published date | 2025-12-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in Multinational
- Multinational - The Interconnection of Electric Grids of Nile Equatorial Lakes Countries (Grant to the Republic of Burundi)
- Ghana - Togo - Benin Power Interconnect
- Multinational- Ruzizi III regional hydropower plant project
- Multinational - Scaling-up the Clean Cooking Industry in Africa
- Multinational- Ruzizi III regional hydropower plant project (Rwanda)
- Multinational - Kigali/Bujumbura oil products pipeline feasability study
- Multinational - Uganda – DRC Power Transmission Study
- Multinational - Study on the Cameroon-Chad Electricity Interconnection Project