logo
Project

Multinational - Feasibility Study for the Luapula Hydro Power Plant

One of 4,322 projects Taiyo tracks in Multinational.

Source: African Development Bank (AfDB)

The Luapula Hydro Power Project (HPP) was identified as a priority project in the SAPP Pool Plan of 2017 as well as on the SADC and PIDA priority list. The Luapula River runs in southcentral Africa forming a boundary between the southern DRC and northern Zambia for about 560km of its course. The Luapula River rises in the Bangweulu Swamps (one of the world’s largest wetlands) lying east of Lake Ba

Sector
Commercial, Power Generation (CCGT), Hydro, Government
Location
World
Updated
22 Jul 2026
Source
African Development Bank (AfDB)

ConstructChat

Ask ConstructChat about Multinational - Feasibility Study for the Luapula Hydro Power Plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Multinational - Feasibility Study for the Luapula Hydro Power Plant” is an infrastructure initiative in the Commercial sector, located in Multinational. Taiyo aggregates data on it from African Development Bank (AfDB).

Participants

Sponsoring Agency

Status

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Luapula Hydro Power Project (HPP) was identified as a priority project in the SAPP Pool Plan of 2017 as well as on the SADC and PIDA priority list. The Luapula River runs in southcentral Africa forming a boundary between the southern DRC and northern Zambia for about 560km of its course. The Luapula River rises in the Bangweulu Swamps (one of the world’s largest wetlands) lying east of Lake Bangweulu in eastern Zambia then descends into a series of falls and runs into Lake Mweru in Tanzania. The Luapula HPP Feasibility Study project aims at investigating and producing a detailed technical, economic assessment of the proposed Mumbotuta CX site, for the delivery of a detailed Feasibility Study Report which will be aligned to an environmental and social impact assessment (ESI) study that will be conducted in parallel with funding from the World Bank. The Feasibility study will include the preparation of specifications and tender documentation as well as a financial-economic study that will lead to the financing, procurement, and construction of the power plant and associated transmission infrastructure.

Original sector

Energy

Budget

Location

Country

World

Source

Source

African Development Bank (AfDB)

URL

More Details

Record type

Project

Sector

Commercial, Power Generation (CCGT), Hydro, Government

Article published date

2025-03-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project