Multinational - Feasibility Study for the Luapula Hydro Power Plant
Sector: Commercial • Location: Multinational
Source: African Development Bank (AfDB)
The Luapula Hydro Power Project (HPP) was identified as a priority project in the SAPP Pool Plan of 2017 as well as on the SADC and PIDA priority list. The Luapula River runs in southcentral Africa forming a boundary between the southern DRC and northern Zambia for about 560km of its course. The Luapula River rises in the Bangweulu Swamps (one of the world’s largest wetlands) lying east of Lake Ba
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Obfuscated Data |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Luapula Hydro Power Project (HPP) was identified as a priority project in the SAPP Pool Plan of 2017 as well as on the SADC and PIDA priority list. The Luapula River runs in southcentral Africa forming a boundary between the southern DRC and northern Zambia for about 560km of its course. The Luapula River rises in the Bangweulu Swamps (one of the world’s largest wetlands) lying east of Lake Bangweulu in eastern Zambia then descends into a series of falls and runs into Lake Mweru in Tanzania. The Luapula HPP Feasibility Study project aims at investigating and producing a detailed technical, economic assessment of the proposed Mumbotuta CX site, for the delivery of a detailed Feasibility Study Report which will be aligned to an environmental and social impact assessment (ESI) study that will be conducted in parallel with funding from the World Bank. The Feasibility study will include the preparation of specifications and tender documentation as well as a financial-economic study that will lead to the financing, procurement, and construction of the power plant and associated transmission infrastructure. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Commercial projects in Multinational
- Multinational - Côte d’Ivoire, Liberia, Sierra Leone and Guinea (CLSG) Electricity Networks Interconnection Project
- Multinational - Desert to Power Initiative West Africa Regional Energy Program – Phase I
- Multinational (Democratic Republic of Congo / Angola) - The Democratic Republic of Congo - Angola Trans-National Economic Corridor Construction Project – Phase 1
- Multinational - Anti-Money Laundering (AML) and Counter-Financing of Terrorism (CFT) in West Africa
- Multinational - Post Cyclone Idai and Kenneth Emergency Recovery and Resilience Programme (PCIREP) – Mozambique
- Multinational - Interconnection of the Electric Grids of the Nile Equatorial Lakes Countries
- Multinational - Project to Interconnect the Power Grids from the Boali Hydro-Power System - Phase I
- Multinational (Cameroon - Nigeria) - Transport Facilitation Program Corridor - Bamenda-Enugu- (PAGODA Supplemental Grant)
