Multinational - Feasibility Study for the Shire-Zambezi Waterways Development Project
Sector: Water Supply and Storage • Location: Multinational
Source: African Development Bank (AfDB)
The Shire–Zambezi Waterways Development Project aims at providing a less costly and more reliable alternative route to the seaports on the coast of the Indian Ocean. Ultimately, it is expected to contribute to the socio-economic development of the three countries (Malawi, Mozambique and Zambia) as a result of the lower expected costs of transportation, improved competiveness of exported goods and
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Obfuscated Data |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Shire–Zambezi Waterways Development Project aims at providing a less costly and more reliable alternative route to the seaports on the coast of the Indian Ocean. Ultimately, it is expected to contribute to the socio-economic development of the three countries (Malawi, Mozambique and Zambia) as a result of the lower expected costs of transportation, improved competiveness of exported goods and greater regional integration and cooperation. The present support concerns the realization of the feasibility study of the said project. This study is requested by the Common Market for Eastern and Southern Africa (COMESA), on behalf of the governments of these countries, for the reopening of the ShireZambezi waterways. It is organized around two main components: (i) feasibility studies on inland waterway transport; and (ii) the development of the water transport business plan. The total duration of the study is 24 months and the total cost, estimated at € 3,056,786. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Water Supply and Storage projects in Multinational
- Multinational (Democratic Republic of Congo / Angola) - The Democratic Republic of Congo - Angola Trans-National Economic Corridor Construction Project – Phase 1
- Multinational - Post Cyclone Idai and Kenneth Emergency Recovery and Resilience Programme (PCIREP) – Mozambique
- Multinational - Interconnection of the Electric Grids of the Nile Equatorial Lakes Countries
- Multinational - Project to Interconnect the Power Grids from the Boali Hydro-Power System - Phase I
- Multinational (Cameroon - Nigeria) - Transport Facilitation Program Corridor - Bamenda-Enugu- (PAGODA Supplemental Grant)
- Multinational - Baynes Hydro Power Project between Angola and Namibia 600 MW Advisory - Angola
- Multinational- Ruzizi III regional hydropower plant project (Burundi)
- Multinational - Feasibility study of the Nyimur Multipurpose Water Resources Project
