logo

Multinational - Feasibility study of the Nyimur Multipurpose Water Resources Project

Sector: Water Supply and Storage • Location: Multinational

Source: African Development Bank (AfDB)

Project

The present operation concerns the feasibility study of the Nyimur Multipurpose Water Resources Project which is part of the Nile Equatorial Lakes Subsidiary Action Program (NELSAP) of the Nile Basin Initiative (NBI). The Nyimur river valley, located in the Aswa River Basin covers just over 31,000 km² in Northern, Eastern and Northeastern Uganda and in the Magwi county of Easter Equatoria state of

Project Information FAQ

Project Information

4 Q
The project “Multinational - Feasibility study of the Nyimur Multipurpose Water Resources Project” is an infrastructure initiative in the Water Supply and Storage sector, located in Multinational. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The present operation concerns the feasibility study of the Nyimur Multipurpose Water Resources Project which is part of the Nile Equatorial Lakes Subsidiary Action Program (NELSAP) of the Nile Basin Initiative (NBI). The Nyimur river valley, located in the Aswa River Basin covers just over 31,000 km² in Northern, Eastern and Northeastern Uganda and in the Magwi county of Easter Equatoria state of South Sudan. The core scheme of the project consists of a 26 m-head dam and reservoir on Nyimur River and five (5) modules of irrigated lowland rice of approximately 5,105 ha. A mini hydropower plant with a capacity of 350 kW is included in the dam component. This study will establish a water resources information/knowledge base and institutional development of the target project area. It includes the following three components: (i) Consultancy services for Technical and Economic Feasibility Studies and Tender Design Studies; (ii) Consultancy services for Environmental and Social Impact Assessment and Resettlement Action Plan (RAP); and (iii) Project management, communication and consultations.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data