Multinational - Feasibility Study on the Extension of the Cameroon-Chad Railway Line (Chad)
Sector: Manufacturing (Industrial) • Location: Multinational
Source: African Development Bank (AfDB)
The purpose of this project is to carry out a railway study between N'Gaoundéré and N'Djamena. This study is part of the railway interconnection project between N'Gaoundéré and Ndjamena and will complete the multimodal framework of the transport chain between the two countries. The project is the result of the will of the Cameroonian and Chadian governments to complete the Douala - N'Djamena railw
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Obfuscated Data |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The purpose of this project is to carry out a railway study between N'Gaoundéré and N'Djamena. This study is part of the railway interconnection project between N'Gaoundéré and Ndjamena and will complete the multimodal framework of the transport chain between the two countries. The project is the result of the will of the Cameroonian and Chadian governments to complete the Douala - N'Djamena railway corridor by the construction of the railway section linking N'Gaoundéré in Cameroon to N'Djamena, the capital of Chad. The integration of the two countries' infrastructure networks (Cameroon and Chad) is of vital importance as it allows for the establishment of common and coherent platforms for the different modes of transport. It also ensures greater inter-connectivity and increased mobility of factors of production as well as multi-faceted trade flows as prerequisites for the establishment of true integration. The purpose of the study is to establish the socio-economic viability of the railway and to determine the best solution from the technical and economic points of view, while taking into account the institutional, social and environmental conditions. The duration of the study project is 36 months at an estimated total cost of UA 4,000 million, including activities related to the establishment of technical assistance and the functioning of the management bodies. The study project is fully funded from ADF resources. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
