Multinational - Ghana-Togo-Benin 330 kV electricity interconnection project
Sector: Oil and Gas • Location: Multinational
Source: African Development Bank (AfDB)
The proposed project, which is part of the West Africa Power Pooling Programme, involves the construction of a 338 kV transmission line between Sakete in Benin and the Volta substation near Tema in Ghana, via Togo. It also includes the extension of the Sakete and Volta-Tema substations as well as the construction of a new substation in Mome Hagou, Togo. The West Africa Power Pooling Programme will
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Obfuscated Data |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The proposed project, which is part of the West Africa Power Pooling Programme, involves the construction of a 338 kV transmission line between Sakete in Benin and the Volta substation near Tema in Ghana, via Togo. It also includes the extension of the Sakete and Volta-Tema substations as well as the construction of a new substation in Mome Hagou, Togo. The West Africa Power Pooling Programme will enable the emergence of a unified electricity market in ECOWAS through the establishment of interconnections between the electricity grids of its member countries. Interconnections such as the Ghana-Togo-Benin transmission line will enable the flow of energy between countries capable of producing hydropower at lower cost and countries where electricity supply currently depends on thermal power stations powered by expensive imported oil. The project will increase transmission capacity between Nigeria, Benin, Togo and Ghana, thus facilitating the exchange of electricity, which is expected to increase the reliability of electricity supply and reduce transaction costs. By enabling power exchange, the interconnections will also enable utilities in the region to optimally manage the use of scarce water resources during drought periods. The total cost of the power line connection project is estimated at UA 71.34 million, equivalent to US$ 115.6 million. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
