Multinational - Guinea - Sierra Leone: Coyah-Farmoreah-Sierra Leone Border Road Reconstruction Project
Sector: Raw Materials • Location: Multinational
Source: African Development Bank (AfDB)
The project for the reconstruction of the Coyah-Farmoreah Sierra-Leone border road was designed to provide a response to the crucial needs to open up the production areas concerned by the project and contribute to improving the competitiveness and diversification of their economies by linking Conakry to Freetown on a fully tarred road. This should unlock the region's strong agricultural and indust
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Obfuscated Data |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The project for the reconstruction of the Coyah-Farmoreah Sierra-Leone border road was designed to provide a response to the crucial needs to open up the production areas concerned by the project and contribute to improving the competitiveness and diversification of their economies by linking Conakry to Freetown on a fully tarred road. This should unlock the region's strong agricultural and industrial potential, stimulate trade, reduce poverty and social inequalities, and consolidate peace and security at the level of Guinea and Sierra Leone. The present project will consist of: (i) rebuilding the 75 km of the road by widening it to the standard ECOWAS standards (7m of pavement and two shoulders of 1.5m each) with a structure covered with asphalt concrete (BB) as well as the structures on this road; (ii) make operational the checkpoints juxtaposed to Pamelap by supporting the interconnection of customs computer systems of both countries as well as the implementation of the joint control of goods on import and export; (iii) provide support to the transport sector by improving road safety, axle load control, and conducting project preparatory studies and (iv) strengthen the capacity of the Executing Agency and Customs Administration in Guinea. The project will be implemented over a period of 4 years for a total cost HT / HD, including physical contingencies and financial uncertainties, estimated at 62.24 million UA, the equivalent of 78.08 million EUR. It comprises five components, namely: (A) Road reconstruction; (B) development and related measures; (C) transport facilitation; (D) support to the transport sector; and (E) project management. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
