logo

Multinational - Guinea - Sierra Leone: Coyah-Farmoreah-Sierra Leone Border Road Reconstruction Project

Sector: Raw Materials • Location: Multinational

Source: African Development Bank (AfDB)

Project

The project for the reconstruction of the Coyah-Farmoreah Sierra-Leone border road was designed to provide a response to the crucial needs to open up the production areas concerned by the project and contribute to improving the competitiveness and diversification of their economies by linking Conakry to Freetown on a fully tarred road. This should unlock the region's strong agricultural and indust

Project Information FAQ

Project Information

4 Q
The project “Multinational - Guinea - Sierra Leone: Coyah-Farmoreah-Sierra Leone Border Road Reconstruction Project” is an infrastructure initiative in the Raw Materials sector, located in Multinational. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project for the reconstruction of the Coyah-Farmoreah Sierra-Leone border road was designed to provide a response to the crucial needs to open up the production areas concerned by the project and contribute to improving the competitiveness and diversification of their economies by linking Conakry to Freetown on a fully tarred road. This should unlock the region's strong agricultural and industrial potential, stimulate trade, reduce poverty and social inequalities, and consolidate peace and security at the level of Guinea and Sierra Leone. The present project will consist of: (i) rebuilding the 75 km of the road by widening it to the standard ECOWAS standards (7m of pavement and two shoulders of 1.5m each) with a structure covered with asphalt concrete (BB) as well as the structures on this road; (ii) make operational the checkpoints juxtaposed to Pamelap by supporting the interconnection of customs computer systems of both countries as well as the implementation of the joint control of goods on import and export; (iii) provide support to the transport sector by improving road safety, axle load control, and conducting project preparatory studies and (iv) strengthen the capacity of the Executing Agency and Customs Administration in Guinea. The project will be implemented over a period of 4 years for a total cost HT / HD, including physical contingencies and financial uncertainties, estimated at 62.24 million UA, the equivalent of 78.08 million EUR. It comprises five components, namely: (A) Road reconstruction; (B) development and related measures; (C) transport facilitation; (D) support to the transport sector; and (E) project management.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data