logo

Multinational - Interconnection of the Electric Grids of the Nile Equatorial Lakes Countries

Sector: Manufacturing (Industrial) • Location: Multinational

Source: African Development Bank (AfDB)

Project

The present operation consists of a supplementary loan of UA 5.840 million to the Republic of Uganda to bridge the financing gap for the Nile Equatorial Lakes Countries Power Interconnection Project. The increase in the cost of the project is mainly due to the unexpected depreciation of the loan currencies against the contract currencies, higher world prices for construction equipment and material

Project Information FAQ

Project Information

4 Q
The project “Multinational - Interconnection of the Electric Grids of the Nile Equatorial Lakes Countries” is an infrastructure initiative in the Manufacturing (Industrial) sector, located in Multinational. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The present operation consists of a supplementary loan of UA 5.840 million to the Republic of Uganda to bridge the financing gap for the Nile Equatorial Lakes Countries Power Interconnection Project. The increase in the cost of the project is mainly due to the unexpected depreciation of the loan currencies against the contract currencies, higher world prices for construction equipment and materials, and changes in project plans. It should be recalled that the original project consisted of the construction of 769 kilometers of 220 and 110 kV transmission lines and 17 transformers to interconnect the power grids of the Nile Equatorial Lakes countries, namely Burundi, Kenya, Uganda, Democratic Republic of Congo and Rwanda, in order to improve energy exchanges between these countries. The Ugandan section of the interconnection project is part of a regional NELSAP project that will address, in the short term, the electricity shortages in the region and, in the longer term, establish an integrated regional grid that will facilitate cross-border electricity trade and improve access to electricity in the Nile lakes countries. The project's success will be facilitated by the additional loan, which will enable it to meet its development objectives.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data