logo
Project

Multinational - Kankan-Kouremale-Bamako Road Development Project

One of 4,322 projects Taiyo tracks in Multinational.

Source: African Development Bank (AfDB)

The Kankan-Kouremale-Bamako Road falls within the framework of both Guinea and Mali sectoral policies aimed at improving the competitiveness of their transport systems through infrastructure modernization, trade and private sector promotion. Project The Kankan-Kouremale-Bamako road is very important to the economic and social development of Guinea’s North-West and Mali’s South-East regions, and in

Sector
Commercial, Cement, Road, Government
Location
World
Updated
22 Jul 2026
Source
African Development Bank (AfDB)

ConstructChat

Ask ConstructChat about Multinational - Kankan-Kouremale-Bamako Road Development Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Multinational - Kankan-Kouremale-Bamako Road Development Project” is an infrastructure initiative in the Commercial sector, located in Multinational. Taiyo aggregates data on it from African Development Bank (AfDB).

Participants

Sponsoring Agency

Status

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Kankan-Kouremale-Bamako Road falls within the framework of both Guinea and Mali sectoral policies aimed at improving the competitiveness of their transport systems through infrastructure modernization, trade and private sector promotion. Project The Kankan-Kouremale-Bamako road is very important to the economic and social development of Guinea’s North-West and Mali’s South-East regions, and in that capacity is a tool for sub-regional integration. As designed, the project aims at reducing constraints in the sub-sector in order to: (i) improve trade-enhancing conditions between the two countries; (ii) strengthen the capacity of road directorates; and (iii) improve conditions to promote SMEs through the road fund. Moreover, the road will provide Mali with an alternative link with the outside world at more economical conditions than existing ones, as well as strengthen economic relations between the two countries. The main components of the project are: 1) construction of two prestressed concrete bridges on the Niger River (490 m long) and on Tinkisso (245 m); 2) construction of an 82 km road 7 m wide and two shoulders of 1.5 each; 3) mitigation measures for environmental impacts by tree planting along the road; and 4) capacity building of the National Directorate of Public Works (DNTP).

Original sector

Transport & Storage

Budget

Location

Country

World

Source

Source

African Development Bank (AfDB)

URL

More Details

Record type

Project

Sector

Commercial, Cement, Road, Government

Article published date

2025-03-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project