logo

Multinational - Kankan-Kouremale-Bamako Road Development Project

Sector: Commercial • Location: Multinational

Source: African Development Bank (AfDB)

Project

The Kankan-Kouremale-Bamako Road falls within the framework of both Guinea and Mali sectoral policies aimed at improving the competitiveness of their transport systems through infrastructure modernization, trade and private sector promotion. Project The Kankan-Kouremale-Bamako road is very important to the economic and social development of Guinea’s North-West and Mali’s South-East regions, and in

Project Information FAQ

Project Information

4 Q
The project “Multinational - Kankan-Kouremale-Bamako Road Development Project” is an infrastructure initiative in the Commercial sector, located in Multinational. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Kankan-Kouremale-Bamako Road falls within the framework of both Guinea and Mali sectoral policies aimed at improving the competitiveness of their transport systems through infrastructure modernization, trade and private sector promotion. Project The Kankan-Kouremale-Bamako road is very important to the economic and social development of Guinea’s North-West and Mali’s South-East regions, and in that capacity is a tool for sub-regional integration. As designed, the project aims at reducing constraints in the sub-sector in order to: (i) improve trade-enhancing conditions between the two countries; (ii) strengthen the capacity of road directorates; and (iii) improve conditions to promote SMEs through the road fund. Moreover, the road will provide Mali with an alternative link with the outside world at more economical conditions than existing ones, as well as strengthen economic relations between the two countries. The main components of the project are: 1) construction of two prestressed concrete bridges on the Niger River (490 m long) and on Tinkisso (245 m); 2) construction of an 82 km road 7 m wide and two shoulders of 1.5 each; 3) mitigation measures for environmental impacts by tree planting along the road; and 4) capacity building of the National Directorate of Public Works (DNTP).

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data