Multinational - Kariba Dam Rehabilitation Project
Sector: Water Supply and Storage • Location: Multinational
Source: African Development Bank (AfDB)
The Kariba Dam Rehabilitation Project involves the rehabilitation of the Kariba Dam infrastructure by reshaping the plunge pool and rehabilitating the spillway. The Plunge Pool will be reshaped in order to dissipate energy from the spilled water thereby reducing the energy on impact and hence bedrock erosion which could undermine the dam foundations, leading to dam failure. The project will rehabi
- Sector
- Water Supply and Storage, Power Generation (CCGT), Hydro, Government
- Location
- World
- Updated
- 22 Jul 2026
- Source
- African Development Bank (AfDB)
ConstructChat
Ask ConstructChat about Multinational - Kariba Dam Rehabilitation Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Kariba Dam Rehabilitation Project involves the rehabilitation of the Kariba Dam infrastructure by reshaping the plunge pool and rehabilitating the spillway. The Plunge Pool will be reshaped in order to dissipate energy from the spilled water thereby reducing the energy on impact and hence bedrock erosion which could undermine the dam foundations, leading to dam failure. The project will rehabilitate the spillway gates to avoid possible jamming in the open or closed positions both of which would result in dam failure and catastrophic regional loss of lives, livelihoods, assets and power. The project will also assist the Zambezi River Authority secure the long-term safety and reliability of the Kariba Dam complex and to forestall a potential dam failure that could disrupt commerce and livelihoods in nine southern African countries (Zambia, Zimbabwe, Malawi, Mozambique, South Africa, Botswana, Namibia, Lesotho and Swaziland) should the dam fail. The project comprises three main components, namely : (i) Plunge Pool Rehabilitation, (ii) Spillway Refurbishment and (iii) Institutional Project Support. |
Original sector | Energy |
Budget |
Location
Country | World |
Source
Source | African Development Bank (AfDB) |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Generation (CCGT), Hydro, Government |
Article published date | 2025-03-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in Multinational
- Multinational - The Interconnection of Electric Grids of Nile Equatorial Lakes Countries (Grant to the Republic of Burundi)
- Multinational - Integrated Programme for Development and Adaptation to Climate Change in the Basin of Niger (PIDACC)
- Multinational- Ruzizi III regional hydropower plant project
- Multinational- Ruzizi III regional hydropower plant project (Rwanda)
- Multinational - Post-Ebola Recovery Social Investment Fund Project (Liberia)
- Cameroon - Transport Facilitation Programme on the Douala – Bangui Corridors
- Multinational - Lake Victoria Water Supply and Sanitation Program - Phase II
- Multinational - Nelson Mandela Institutes - African Institutions of Science and Technology Project
